Journal article · 2026 · Open access
Long-lead forecasting of El Niño–Southern Oscillation using score-driven models with many predictors
International Journal of Forecasting · Published 1 October 2026 · DOI 10.1016/j.ijforecast.2026.09.009
In brief
“Long-lead forecasting of El Niño–Southern Oscillation using score-driven models with many predictors” is a 2026 journal article by Janneke van Brummelen and 3 co-authors, published in International Journal of Forecasting. OpenAlex counts 0 citations as of 20 November 2026. It is open access under a CC BY licence: the full text is free to read at International Journal of Forecasting.
- Citations
- 0
- References
- 49
- Authors
- 4
Abstract
We consider long-lead forecasting of the El Niño–Southern Oscillation (ENSO) climate phenomenon. This is widely seen as a challenging task from a methodological perspective. At the same time, ENSO events are of substantial societal importance. We adopt a class of score-driven models to capture the key dynamic features of the Niño 3.4 index and include a large set of previously designed predictors. We provide details of our forecasting methodology and assess the forecast accuracy for a range of different model specifications and estimation strategies. We conclude that a model with a good description of the dynamic features in the data is also able to provide accurate forecasts for almost all lead times, up to 18 months ahead. The large set of predictors is shown to support the provision of accurate long-range forecasts for specific lead times.
Cite this paper
Formatted from the catalogue record. Check names, capitals and page numbers against the paper before you submit.
APA 7
van Brummelen, J., Jensen, S., Koopman, S. J., & Petrova, D. (2026). Long-lead forecasting of El Niño–Southern Oscillation using score-driven models with many predictors. International Journal of Forecasting. https://doi.org/10.1016/j.ijforecast.2026.09.009
MLA 9
van Brummelen, Janneke, et al. “Long-lead forecasting of El Niño–Southern Oscillation using score-driven models with many predictors.” International Journal of Forecasting, 2026. https://doi.org/10.1016/j.ijforecast.2026.09.009.
Chicago
van Brummelen, Janneke, Sebastian Jensen, Siem Jan Koopman, and Desislava Petrova. 2026. “Long-lead forecasting of El Niño–Southern Oscillation using score-driven models with many predictors.” International Journal of Forecasting. https://doi.org/10.1016/j.ijforecast.2026.09.009.
Harvard
van Brummelen, J. et al. (2026) ‘Long-lead forecasting of El Niño–Southern Oscillation using score-driven models with many predictors’, International Journal of Forecasting. doi:10.1016/j.ijforecast.2026.09.009.
IEEE
J. van Brummelen, S. Jensen, S. J. Koopman, and D. Petrova, “Long-lead forecasting of El Niño–Southern Oscillation using score-driven models with many predictors,” International Journal of Forecasting, 2026, doi: 10.1016/j.ijforecast.2026.09.009.
BibTeX
@article{vanbrummelen2026long,
title = {{Long-lead forecasting of El Niño–Southern Oscillation using score-driven models with many predictors}},
author = {van Brummelen, Janneke and Jensen, Sebastian and Koopman, Siem Jan and Petrova, Desislava},
journal = {International Journal of Forecasting},
year = {2026},
doi = {10.1016/j.ijforecast.2026.09.009},
url = {https://doi.org/10.1016/j.ijforecast.2026.09.009}
}
Download for a reference manager: BibTeX (.bib) · RIS for Zotero, Mendeley and EndNote (.ris)
Topic and keywords
Physical Sciences › Environmental Science › Global and Planetary Change › Climate variability and models
- ENSO
- long-lead forecasting
- score-driven models
- Niño 3.4 index
- climate prediction
- forecast accuracy
- dynamic model
Work with this paper
Most-cited papers in Environmental Science
- Biodiversity hotspots for conservation prioritiesNorman Myers, Russell A. Mittermeier, Cristina Goettsch Mittermeier and 2 more · Nature · 2000 · 32,720 citations
- The Tragedy of the CommonsGarrett Hardin · Science · 1968 · 26,194 citations
- River flow forecasting through conceptual models part I — A discussion of principlesJ.E. Nash, John V. Sutcliffe · Journal of Hydrology · 1970 · 24,625 citations
- The value of the world's ecosystem services and natural capitalRobert Costanza, Ralph C. d’Arge, R.S. de Groot and 10 more · Nature · 1997 · 23,508 citations
- Climate change 2007: the physical science basisSusan Solomon, Dahe Qin, Martin Manning and 5 more · 2007 · 23,383 citations
Questions about this paper
How do I cite this paper in APA style?
van Brummelen, J., Jensen, S., Koopman, S. J., & Petrova, D. (2026). Long-lead forecasting of El Niño–Southern Oscillation using score-driven models with many predictors. International Journal of Forecasting. https://doi.org/10.1016/j.ijforecast.2026.09.009
How many times has this paper been cited?
0 times, according to OpenAlex on 20 November 2026. Google Scholar and Scopus count different sets of sources, so their numbers differ.
Is this paper free to read?
Yes. It is open access at International Journal of Forecasting: sign in and open the PDF from this page.
Who wrote this paper?
Janneke van Brummelen, Sebastian Jensen, Siem Jan Koopman, Desislava Petrova.
What is the DOI of this paper?
10.1016/j.ijforecast.2026.09.009, permanently at https://doi.org/10.1016/j.ijforecast.2026.09.009. Sign in and open it from this page.
Bibliographic data from OpenAlex (CC0), last checked 20 November 2026. ResearchGuru does not host this paper; once you are signed in, the links open it at the publisher or the repository that does.