Journal article · 2024 · Open access

The 2023/24 El Niño and the Feasibility of Long-Lead ENSO Forecasting

Desislava Petrova, Xavier Rodó, Siem Jan Koopman, Vassil Tzanov, Ivana Cvijanović

Bulletin of the American Meteorological Society, 105(10), E1915–E1928 · Published 16 August 2024 · DOI 10.1175/bams-d-23-0158.1

Open PDFView at the publisherCite this paper

In brief

“The 2023/24 El Niño and the Feasibility of Long-Lead ENSO Forecasting” is a 2024 journal article by Desislava Petrova and 4 co-authors, published in Bulletin of the American Meteorological Society. OpenAlex counts 11 citations as of 20 November 2026, which puts it in the top 3% of works published in 2024 by citations. It is open access under a CC BY licence: the full text is free to read at Bulletin of the American Meteorological Society.

Citations
11
Most cited in
2025 (7)
Field-weighted impact
1.17
References
61
Authors
5

Abstract

Through its atmospheric teleconnections, El Niño–Southern Oscillation (ENSO) shifts and disrupts weather and climate patterns far beyond the equatorial Pacific where it occurs often resulting in catastrophic consequences in many countries of the world. It is also the largest source of seasonal and interannual climate predictability. Despite its huge importance, ENSO forecasting is still not performed operationally at longer leads than about 6 months ahead. At the same time, there is mounting scientific evidence that forecasts are possible even more than a year in advance. Early warning of ENSO events could substantially mitigate some of the most damaging impacts, such as floods, droughts, and harvest failure and help avoid famine, migration, and disease outbreaks. Here, we present forecasts from a statistical ENSO model of the next El Niño predicted to occur in the winter of 2023/24, at lead times between 11 and 17 months ahead of an expected peak in December 2023. We use a statistical unobserved dynamic components model (EDCM) based on subsurface ocean temperatures as well as sea surface temperatures and zonal wind stress. EDCM has been previously validated through hindcasts of the major El Niños since 1970 and through real-time forecasts of the 2015/16 and 2018/19 El Niños. Our statistical framework and results indicate that there is potential for doubling the operational predictive lead time of ENSO to at least 12 months, with additional promise for even earlier anticipation of 19 months. Such longer-lead forecasts could be of high value, because decision-making and management in a number of key socioeconomic sectors could be greatly improved. Significance Statement We employ a statistical ENSO model and show early forecasting of the 2023 El Niño (EN). Early forecasts initiated in May and July 2022 predicted a mild EN. Forecasts initiated later, in November 2022 and January 2023, predicted a moderate EN, with a strong event falling within the 70% confidence intervals. This work confirms that statistical long-lead ENSO forecasts are feasible and should be developed further in advance of the operational threshold of 6–8 months. Such forecasts are of high value for agriculture, water management, disaster reduction, public health, and energy production in countries affected by ENSO. More so, a strong EN could lead to a temporary breach of the 1.5°C threshold for global mean temperature increase set in the Paris Climate Agreement.

Cite this paper

Formatted from the catalogue record. Check names, capitals and page numbers against the paper before you submit.

APA 7

Petrova, D., Rodó, X., Koopman, S. J., Tzanov, V., & Cvijanović, I. (2024). The 2023/24 El Niño and the Feasibility of Long-Lead ENSO Forecasting. Bulletin of the American Meteorological Society, 105(10), E1915–E1928. https://doi.org/10.1175/bams-d-23-0158.1

MLA 9

Petrova, Desislava, et al. “The 2023/24 El Niño and the Feasibility of Long-Lead ENSO Forecasting.” Bulletin of the American Meteorological Society, vol. 105, no. 10, 2024, pp. E1915–E1928. https://doi.org/10.1175/bams-d-23-0158.1.

Chicago

Petrova, Desislava, Xavier Rodó, Siem Jan Koopman, Vassil Tzanov, and Ivana Cvijanović. 2024. “The 2023/24 El Niño and the Feasibility of Long-Lead ENSO Forecasting.” Bulletin of the American Meteorological Society 105 (10): E1915–E1928. https://doi.org/10.1175/bams-d-23-0158.1.

Harvard

Petrova, D. et al. (2024) ‘The 2023/24 El Niño and the Feasibility of Long-Lead ENSO Forecasting’, Bulletin of the American Meteorological Society, 105(10), pp. E1915–E1928. doi:10.1175/bams-d-23-0158.1.

IEEE

D. Petrova, X. Rodó, S. J. Koopman, V. Tzanov, and I. Cvijanović, “The 2023/24 El Niño and the Feasibility of Long-Lead ENSO Forecasting,” Bulletin of the American Meteorological Society, vol. 105, no. 10, pp. E1915–E1928, 2024, doi: 10.1175/bams-d-23-0158.1.

BibTeX

@article{petrova2024feasibility,
  title     = {{The 2023/24 El Niño and the Feasibility of Long-Lead ENSO Forecasting}},
  author    = {Petrova, Desislava and Rodó, Xavier and Koopman, Siem Jan and Tzanov, Vassil and Cvijanović, Ivana},
  journal   = {Bulletin of the American Meteorological Society},
  year      = {2024},
  volume    = {105},
  number    = {10},
  pages     = {E1915--E1928},
  doi       = {10.1175/bams-d-23-0158.1},
  url       = {https://doi.org/10.1175/bams-d-23-0158.1}
}

Download for a reference manager: BibTeX (.bib) · RIS for Zotero, Mendeley and EndNote (.ris)

Topic and keywords

Physical Sciences › Environmental Science › Global and Planetary Change › Climate variability and models

  • ENSO
  • subsurface ocean temperature
  • sea surface temperature
  • zonal wind stress
  • climate predictability
  • ENSO teleconnections

Work with this paper

Most-cited papers in Environmental Science

All highly cited Environmental Science papers

Questions about this paper

How do I cite this paper in APA style?

Petrova, D., Rodó, X., Koopman, S. J., Tzanov, V., & Cvijanović, I. (2024). The 2023/24 El Niño and the Feasibility of Long-Lead ENSO Forecasting. Bulletin of the American Meteorological Society, 105(10), E1915–E1928. https://doi.org/10.1175/bams-d-23-0158.1

How many times has this paper been cited?

11 times, according to OpenAlex on 20 November 2026. Google Scholar and Scopus count different sets of sources, so their numbers differ.

Is this paper free to read?

Yes. It is open access at Bulletin of the American Meteorological Society: sign in and open the PDF from this page.

Who wrote this paper?

Desislava Petrova, Xavier Rodó, Siem Jan Koopman, Vassil Tzanov, Ivana Cvijanović.

What is the DOI of this paper?

10.1175/bams-d-23-0158.1, permanently at https://doi.org/10.1175/bams-d-23-0158.1. Sign in and open it from this page.

Bibliographic data from OpenAlex (CC0), last checked 20 November 2026. ResearchGuru does not host this paper; once you are signed in, the links open it at the publisher or the repository that does.