Paper · 2024 · Open access

Long-Lead ENSO Predictability: the 2023/24 El Niño

Desislava Petrova, Xavier Rodó, Siem Jan Koopman, Vassil Tzanov, Ivana Cvijanović

Published 5 July 2024 · DOI 10.5194/ems2024-868

Open full textCite this paper

In brief

“Long-Lead ENSO Predictability: the 2023/24 El Niño” is a 2024 paper by Desislava Petrova and 4 co-authors. OpenAlex counts 0 citations as of 20 November 2026. It is open access under a CC BY licence: the full text is free to read.

Citations
0
Authors
5

Abstract

Long-lead climate predictions are increasingly in demand due to climate change. Through its well-known atmospheric teleconnections El Niño Southern Oscillation (ENSO) is a leading source of seasonal and interannual climate predictability, but currently operational ENSO forecasts are limited to about two seasons in advance. At the same time the scientific literature pointing to the feasibility of ENSO forecasts one year and even more in advance is increasing. The early anticipation of ENSO could prepare vulnerable communities around the world and help mitigate its most devastating impacts such as droughts, floods, poor harvests, and the spread of infectious diseases. Here we showcase real-time forecasts of the recent 2023/24 El Niño at lead times up to 1.5 years in advance of an expected peak in December 2023. We use a previously validated statistical ENSO model that relies on surface and subsurface ocean temperatures and zonal wind stress as predictors, and includes various dynamic components in the form of time-varying cyclical components. Real-time early forecasts with the same model were also issued for the 2015/16 and 2018/19 El Niños, when the long-lead forecasts were also coupled to an impact dengue fever model for the city of Machala in Ecuador to predict the probability of a dengue outbreak in the region up to 11 months in advance. In both cases the dengue predictions were successful indicating an outbreak in 2016 and a low dengue season in 2019. Therefore, such longer-lead ENSO forecasts could directly facilitate decision-making in the health sector, but also other key sectors of society.

Cite this paper

Formatted from the catalogue record. Check names, capitals and page numbers against the paper before you submit.

APA 7

Petrova, D., Rodó, X., Koopman, S. J., Tzanov, V., & Cvijanović, I. (2024). Long-Lead ENSO Predictability: the 2023/24 El Niño. https://doi.org/10.5194/ems2024-868

MLA 9

Petrova, Desislava, et al. “Long-Lead ENSO Predictability: the 2023/24 El Niño.” 2024. https://doi.org/10.5194/ems2024-868.

Chicago

Petrova, Desislava, Xavier Rodó, Siem Jan Koopman, Vassil Tzanov, and Ivana Cvijanović. 2024. “Long-Lead ENSO Predictability: the 2023/24 El Niño.” https://doi.org/10.5194/ems2024-868.

Harvard

Petrova, D. et al. (2024) ‘Long-Lead ENSO Predictability: the 2023/24 El Niño’. doi:10.5194/ems2024-868.

IEEE

D. Petrova, X. Rodó, S. J. Koopman, V. Tzanov, and I. Cvijanović, “Long-Lead ENSO Predictability: the 2023/24 El Niño,” 2024, doi: 10.5194/ems2024-868.

BibTeX

@article{petrova2024long,
  title     = {{Long-Lead ENSO Predictability: the 2023/24 El Niño}},
  author    = {Petrova, Desislava and Rodó, Xavier and Koopman, Siem Jan and Tzanov, Vassil and Cvijanović, Ivana},
  year      = {2024},
  doi       = {10.5194/ems2024-868},
  url       = {https://doi.org/10.5194/ems2024-868}
}

Download for a reference manager: BibTeX (.bib) · RIS for Zotero, Mendeley and EndNote (.ris)

Topic and keywords

Physical Sciences › Environmental Science › Global and Planetary Change › Climate variability and models

  • ENSO
  • long-lead forecasting
  • ENSO teleconnections
  • zonal wind stress
  • climate-health nexus
  • 2015-2016 El Niño
  • Machala, Ecuador

Work with this paper

Most-cited papers in Environmental Science

All highly cited Environmental Science papers

Questions about this paper

How do I cite this paper in APA style?

Petrova, D., Rodó, X., Koopman, S. J., Tzanov, V., & Cvijanović, I. (2024). Long-Lead ENSO Predictability: the 2023/24 El Niño. https://doi.org/10.5194/ems2024-868

How many times has this paper been cited?

0 times, according to OpenAlex on 20 November 2026. Google Scholar and Scopus count different sets of sources, so their numbers differ.

Is this paper free to read?

Yes. It is open access: sign in and open the full text from this page.

Who wrote this paper?

Desislava Petrova, Xavier Rodó, Siem Jan Koopman, Vassil Tzanov, Ivana Cvijanović.

What is the DOI of this paper?

10.5194/ems2024-868, permanently at https://doi.org/10.5194/ems2024-868. Sign in and open it from this page.

Bibliographic data from OpenAlex (CC0), last checked 20 November 2026. ResearchGuru does not host this paper; once you are signed in, the links open it at the publisher or the repository that does.