Journal article · 2023
Stochastic Resource Allocation and Delay Analysis for Mobile Edge Computing Systems
IEEE Transactions on Communications, 71(7), 4018–4033 · Published 11 April 2023 · DOI 10.1109/tcomm.2023.3266353
In brief
“Stochastic Resource Allocation and Delay Analysis for Mobile Edge Computing Systems” is a 2023 journal article by Yitu Wang and 4 co-authors, published in IEEE Transactions on Communications. OpenAlex counts 33 citations as of 19 November 2026, which puts it in the top 2% of works published in 2023 by citations. The publisher's version is not open access, and OpenAlex records no free legal copy.
- Citations
- 33
- Most cited in
- 2025 (12)
- Field-weighted impact
- 2.49
- References
- 41
- Authors
- 5
Abstract
To alleviate the local computation demands from the ever-increasing computation-intensive mobile applications, Mobile Edge Computing (MEC) has proved promising. Especially, by opportunistically offloading these computation tasks to the MEC server, the delay of computing could be significantly improved through communication. In this paper, we develop an analytical framework for joint communication and computation resources allocation… Read the full abstract at the publisher.
Excerpt. This paper is not open access.
Cite this paper
Formatted from the catalogue record. Check names, capitals and page numbers against the paper before you submit.
APA 7
Wang, Y., Wang, W., Lau, V. K. N., Nakachi, T., & Zhang, Z. (2023). Stochastic Resource Allocation and Delay Analysis for Mobile Edge Computing Systems. IEEE Transactions on Communications, 71(7), 4018–4033. https://doi.org/10.1109/tcomm.2023.3266353
MLA 9
Wang, Yitu, et al. “Stochastic Resource Allocation and Delay Analysis for Mobile Edge Computing Systems.” IEEE Transactions on Communications, vol. 71, no. 7, 2023, pp. 4018–4033. https://doi.org/10.1109/tcomm.2023.3266353.
Chicago
Wang, Yitu, Wei Wang, Vincent K. N. Lau, Takayuki Nakachi, and Zhaoyang Zhang. 2023. “Stochastic Resource Allocation and Delay Analysis for Mobile Edge Computing Systems.” IEEE Transactions on Communications 71 (7): 4018–4033. https://doi.org/10.1109/tcomm.2023.3266353.
Harvard
Wang, Y. et al. (2023) ‘Stochastic Resource Allocation and Delay Analysis for Mobile Edge Computing Systems’, IEEE Transactions on Communications, 71(7), pp. 4018–4033. doi:10.1109/tcomm.2023.3266353.
IEEE
Y. Wang, W. Wang, V. K. N. Lau, T. Nakachi, and Z. Zhang, “Stochastic Resource Allocation and Delay Analysis for Mobile Edge Computing Systems,” IEEE Transactions on Communications, vol. 71, no. 7, pp. 4018–4033, 2023, doi: 10.1109/tcomm.2023.3266353.
BibTeX
@article{wang2023stochastic,
title = {{Stochastic Resource Allocation and Delay Analysis for Mobile Edge Computing Systems}},
author = {Wang, Yitu and Wang, Wei and Lau, Vincent K. N. and Nakachi, Takayuki and Zhang, Zhaoyang},
journal = {IEEE Transactions on Communications},
year = {2023},
volume = {71},
number = {7},
pages = {4018--4033},
doi = {10.1109/tcomm.2023.3266353},
url = {https://doi.org/10.1109/tcomm.2023.3266353}
}
Download for a reference manager: BibTeX (.bib) · RIS for Zotero, Mendeley and EndNote (.ris)
Citations by year
| Year | Citations | Share of the best year |
|---|---|---|
| 2024 | 11 | |
| 2025 | 12 | |
| 2026 | 10 |
Its field-weighted citation impact is 2.49: it has been cited 2.49 times as often as the average work of the same field, type and year (1.00 is the world average).
Topic and keywords
Physical Sciences › Computer Science › Computer Networks and Communications › IoT and Edge/Fog Computing
- mobile edge computing
- computation offloading
- resource allocation
- Lyapunov optimization
- steady-state queue length distribution
- multi-user systems
Work with this paper
Most-cited papers in Computer Science
- ImageNet classification with deep convolutional neural networksAlex Krizhevsky, Ilya Sutskever, Geoffrey E. Hinton · Communications of the ACM · 2017 · 114,726 citations
- Long Short-Term MemorySepp Hochreiter, Jürgen Schmidhuber · Neural Computation · 1997 · 109,097 citations
- A Mathematical Theory of CommunicationClaude E. Shannon · Bell System Technical Journal · 1948 · 91,736 citations
- Deep learningYann LeCun, Yoshua Bengio, Geoffrey E. Hinton · Nature · 2015 · 90,226 citations
- Faster R-CNN: Towards Real-Time Object Detection with Region Proposal NetworksShaoqing Ren, Kaiming He, Ross Girshick and 1 more · IEEE Transactions on Pattern Analysis and Machine Intelligence · 2016 · 74,143 citations
Questions about this paper
How do I cite this paper in APA style?
Wang, Y., Wang, W., Lau, V. K. N., Nakachi, T., & Zhang, Z. (2023). Stochastic Resource Allocation and Delay Analysis for Mobile Edge Computing Systems. IEEE Transactions on Communications, 71(7), 4018–4033. https://doi.org/10.1109/tcomm.2023.3266353
How many times has this paper been cited?
33 times, according to OpenAlex on 19 November 2026. Google Scholar and Scopus count different sets of sources, so their numbers differ.
Is this paper free to read?
OpenAlex records no free legal copy. Check your library's access, the authors' pages or a repository, or ask the corresponding author for a copy.
Who wrote this paper?
Yitu Wang, Wei Wang, Vincent K. N. Lau, Takayuki Nakachi, Zhaoyang Zhang.
What is the DOI of this paper?
10.1109/tcomm.2023.3266353, permanently at https://doi.org/10.1109/tcomm.2023.3266353. Sign in and open it from this page.
Bibliographic data from OpenAlex (CC0), last checked 19 November 2026. ResearchGuru does not host this paper; once you are signed in, the links open it at the publisher or the repository that does.