Journal article · 2022

Delay Analysis of Mobile Edge Computing Using Poisson Cluster Process Modeling: A Stochastic Network Calculus Perspective

Muyu Mei, Mingwu Yao, Qinghai Yang, Meng Qin, Kyung Sup Kwak, Ramesh R. Rao

IEEE Transactions on Communications, 70(4), 2532–2546 · Published 16 February 2022 · DOI 10.1109/tcomm.2022.3151879

View at the publisherCite this paper

In brief

“Delay Analysis of Mobile Edge Computing Using Poisson Cluster Process Modeling: A Stochastic Network Calculus Perspective” is a 2022 journal article by Muyu Mei and 5 co-authors, published in IEEE Transactions on Communications. OpenAlex counts 54 citations as of 19 November 2026, which puts it in the top 5% of works published in 2022 by citations. The publisher's version is not open access, and OpenAlex records no free legal copy.

Citations
54
Most cited in
2026 (15)
Field-weighted impact
3.67
References
33
Authors
6

Abstract

Wireless networks in next generation will provide users ubiquitous computing services with low delay by devices at the network edge, namely mobile edge computing (MEC). The intensive computation tasks can be partially offloaded to the MEC server via the wireless link and then processed through the MEC computation resources to cater for the delay demand.… Read the full abstract at the publisher.

Excerpt. This paper is not open access.

Cite this paper

Formatted from the catalogue record. Check names, capitals and page numbers against the paper before you submit.

APA 7

Mei, M., Yao, M., Yang, Q., Qin, M., Kwak, K. S., & Rao, R. R. (2022). Delay Analysis of Mobile Edge Computing Using Poisson Cluster Process Modeling: A Stochastic Network Calculus Perspective. IEEE Transactions on Communications, 70(4), 2532–2546. https://doi.org/10.1109/tcomm.2022.3151879

MLA 9

Mei, Muyu, et al. “Delay Analysis of Mobile Edge Computing Using Poisson Cluster Process Modeling: A Stochastic Network Calculus Perspective.” IEEE Transactions on Communications, vol. 70, no. 4, 2022, pp. 2532–2546. https://doi.org/10.1109/tcomm.2022.3151879.

Chicago

Mei, Muyu, Mingwu Yao, Qinghai Yang, Meng Qin, Kyung Sup Kwak, and Ramesh R. Rao. 2022. “Delay Analysis of Mobile Edge Computing Using Poisson Cluster Process Modeling: A Stochastic Network Calculus Perspective.” IEEE Transactions on Communications 70 (4): 2532–2546. https://doi.org/10.1109/tcomm.2022.3151879.

Harvard

Mei, M. et al. (2022) ‘Delay Analysis of Mobile Edge Computing Using Poisson Cluster Process Modeling: A Stochastic Network Calculus Perspective’, IEEE Transactions on Communications, 70(4), pp. 2532–2546. doi:10.1109/tcomm.2022.3151879.

IEEE

M. Mei, M. Yao, Q. Yang, M. Qin, K. S. Kwak, and R. R. Rao, “Delay Analysis of Mobile Edge Computing Using Poisson Cluster Process Modeling: A Stochastic Network Calculus Perspective,” IEEE Transactions on Communications, vol. 70, no. 4, pp. 2532–2546, 2022, doi: 10.1109/tcomm.2022.3151879.

BibTeX

@article{mei2022delay,
  title     = {{Delay Analysis of Mobile Edge Computing Using Poisson Cluster Process Modeling: A Stochastic Network Calculus Perspective}},
  author    = {Mei, Muyu and Yao, Mingwu and Yang, Qinghai and Qin, Meng and Kwak, Kyung Sup and Rao, Ramesh R.},
  journal   = {IEEE Transactions on Communications},
  year      = {2022},
  volume    = {70},
  number    = {4},
  pages     = {2532--2546},
  doi       = {10.1109/tcomm.2022.3151879},
  url       = {https://doi.org/10.1109/tcomm.2022.3151879}
}

Download for a reference manager: BibTeX (.bib) · RIS for Zotero, Mendeley and EndNote (.ris)

Citations by year

YearCitationsShare of the best year
202233
20231111
20241212
20251313
20261515

Its field-weighted citation impact is 3.67: it has been cited 3.67 times as often as the average work of the same field, type and year (1.00 is the world average).

Topic and keywords

Physical Sciences › Computer Science › Computer Networks and Communications › IoT and Edge/Fog Computing

  • mobile edge computing
  • delay analysis
  • Poisson cluster process
  • stochastic network calculus
  • OFDMA
  • task offloading
  • delay violation probability
  • signal-to-interference ratio

Work with this paper

Most-cited papers in Computer Science

All highly cited Computer Science papers

Questions about this paper

How do I cite this paper in APA style?

Mei, M., Yao, M., Yang, Q., Qin, M., Kwak, K. S., & Rao, R. R. (2022). Delay Analysis of Mobile Edge Computing Using Poisson Cluster Process Modeling: A Stochastic Network Calculus Perspective. IEEE Transactions on Communications, 70(4), 2532–2546. https://doi.org/10.1109/tcomm.2022.3151879

How many times has this paper been cited?

54 times, according to OpenAlex on 19 November 2026. Google Scholar and Scopus count different sets of sources, so their numbers differ.

Is this paper free to read?

OpenAlex records no free legal copy. Check your library's access, the authors' pages or a repository, or ask the corresponding author for a copy.

Who wrote this paper?

Muyu Mei, Mingwu Yao, Qinghai Yang, Meng Qin, Kyung Sup Kwak, Ramesh R. Rao.

What is the DOI of this paper?

10.1109/tcomm.2022.3151879, permanently at https://doi.org/10.1109/tcomm.2022.3151879. Sign in and open it from this page.

Bibliographic data from OpenAlex (CC0), last checked 19 November 2026. ResearchGuru does not host this paper; once you are signed in, the links open it at the publisher or the repository that does.