Journal article · 2020 · Open access

PERANCANGAN ULANG TATA LETAK FASILITAS PRODUKSI UKM EKO BUBUT DENGAN METODE COMPUTERIZED RELATIONSHIP LAYOUT PLANNING (CORELAP)

Okka Adiyanto, Anom Firda Clistia

JISI Jurnal Integrasi Sistem Industri, 7(1), 49–56 · Published 10 May 2020 · DOI 10.24853/jisi.7.1.49-56

Open PDFView at the publisherCite this paper

In brief

“PERANCANGAN ULANG TATA LETAK FASILITAS PRODUKSI UKM EKO BUBUT DENGAN METODE COMPUTERIZED RELATIONSHIP LAYOUT PLANNING (CORELAP)” is a 2020 journal article by Okka Adiyanto and Anom Firda Clistia, published in JISI Jurnal Integrasi Sistem Industri. OpenAlex counts 36 citations as of 19 November 2026. It is open access under a CC BY-NC licence: the full text is free to read at JISI Jurnal Integrasi Sistem Industri.

Citations
36
Most cited in
2024 (13)
Field-weighted impact
0.94
References
8
Authors
2

Abstract

Perancangan sebuah tata letak fasilitas produksi merupakan salah satu hal yang penting untuk meningkatkan hasil produksi serta memperlancar alur proses produksi. Penelitian kali ini dilakukan di Usaha Kecil Menengah (UKM) Eko Bubut yang memproduksi kerajinan dari kayu. Kendala yang dihadapi UKM Eko bubut yaitu, banyaknya produk yang menumpuk di departemen jigsaw dan bubut. Selain adanya penumpukan produksi, penghambat aliran produksi yaitu adanya back tracking di departemen oven ke departemen pengecatan. Tujuan dari penelitian ini adalah untuk merancang layout usulan dengan metode CORELAP. Produk yang diambil untuk melakukan penelitian ini adalah sendok kayu yang memiliki 9 departemen. Penelitian ini menggunakan metode CORELAP merupakan metode construction yang mengubah data kualitatif menjadi data kuantitatif sehingga menentukan fasilitas pertama yang diletakkan didalam layout diperlukan data keterkaitan hubungan aktivitas. Terdapat 3 hasil alternatif menggunakan CORELAP, alternatif 1 memiliki OMH sebesar 13.410,96 dan skor sebesar 30. Alternatif 2 OMH sebesar 6.318,21 dan skor sebesar 31. Alternatif 3 memiliki OMH sebesar 5.304,59 dan skor 26. Dari hasil perhitungan CORELAP maka dipilih usulan alternatif 3.

Cite this paper

Formatted from the catalogue record. Check names, capitals and page numbers against the paper before you submit.

APA 7

Adiyanto, O., & Clistia, A. F. (2020). PERANCANGAN ULANG TATA LETAK FASILITAS PRODUKSI UKM EKO BUBUT DENGAN METODE COMPUTERIZED RELATIONSHIP LAYOUT PLANNING (CORELAP). JISI Jurnal Integrasi Sistem Industri, 7(1), 49–56. https://doi.org/10.24853/jisi.7.1.49-56

MLA 9

Adiyanto, Okka, and Anom Firda Clistia. “PERANCANGAN ULANG TATA LETAK FASILITAS PRODUKSI UKM EKO BUBUT DENGAN METODE COMPUTERIZED RELATIONSHIP LAYOUT PLANNING (CORELAP).” JISI Jurnal Integrasi Sistem Industri, vol. 7, no. 1, 2020, pp. 49–56. https://doi.org/10.24853/jisi.7.1.49-56.

Chicago

Adiyanto, Okka and Anom Firda Clistia. 2020. “PERANCANGAN ULANG TATA LETAK FASILITAS PRODUKSI UKM EKO BUBUT DENGAN METODE COMPUTERIZED RELATIONSHIP LAYOUT PLANNING (CORELAP).” JISI Jurnal Integrasi Sistem Industri 7 (1): 49–56. https://doi.org/10.24853/jisi.7.1.49-56.

Harvard

Adiyanto, O. and Clistia, A. F. (2020) ‘PERANCANGAN ULANG TATA LETAK FASILITAS PRODUKSI UKM EKO BUBUT DENGAN METODE COMPUTERIZED RELATIONSHIP LAYOUT PLANNING (CORELAP)’, JISI Jurnal Integrasi Sistem Industri, 7(1), pp. 49–56. doi:10.24853/jisi.7.1.49-56.

IEEE

O. Adiyanto and A. F. Clistia, “PERANCANGAN ULANG TATA LETAK FASILITAS PRODUKSI UKM EKO BUBUT DENGAN METODE COMPUTERIZED RELATIONSHIP LAYOUT PLANNING (CORELAP),” JISI Jurnal Integrasi Sistem Industri, vol. 7, no. 1, pp. 49–56, 2020, doi: 10.24853/jisi.7.1.49-56.

BibTeX

@article{adiyanto2020perancangan,
  title     = {{PERANCANGAN ULANG TATA LETAK FASILITAS PRODUKSI UKM EKO BUBUT DENGAN METODE COMPUTERIZED RELATIONSHIP LAYOUT PLANNING (CORELAP)}},
  author    = {Adiyanto, Okka and Clistia, Anom Firda},
  journal   = {JISI Jurnal Integrasi Sistem Industri},
  year      = {2020},
  volume    = {7},
  number    = {1},
  pages     = {49--56},
  doi       = {10.24853/jisi.7.1.49-56},
  url       = {https://doi.org/10.24853/jisi.7.1.49-56}
}

Download for a reference manager: BibTeX (.bib) · RIS for Zotero, Mendeley and EndNote (.ris)

Citations by year

YearCitationsShare of the best year
202111
202222
202355
20241313
20251111
202644

Its field-weighted citation impact is 0.94: it has been cited 0.94 times as often as the average work of the same field, type and year (1.00 is the world average).

Topic and keywords

Physical Sciences › Engineering › Industrial and Manufacturing Engineering › Advanced Manufacturing and Logistics Optimization

  • production facility layout
  • CORELAP
  • small and medium-sized enterprises
  • wood handicrafts
  • layout design

Work with this paper

Most-cited papers in Engineering

All highly cited Engineering papers

Questions about this paper

How do I cite this paper in APA style?

Adiyanto, O., & Clistia, A. F. (2020). PERANCANGAN ULANG TATA LETAK FASILITAS PRODUKSI UKM EKO BUBUT DENGAN METODE COMPUTERIZED RELATIONSHIP LAYOUT PLANNING (CORELAP). JISI Jurnal Integrasi Sistem Industri, 7(1), 49–56. https://doi.org/10.24853/jisi.7.1.49-56

How many times has this paper been cited?

36 times, according to OpenAlex on 19 November 2026. Google Scholar and Scopus count different sets of sources, so their numbers differ.

Is this paper free to read?

Yes. It is open access at JISI Jurnal Integrasi Sistem Industri: sign in and open the PDF from this page.

Who wrote this paper?

Okka Adiyanto, Anom Firda Clistia.

What is the DOI of this paper?

10.24853/jisi.7.1.49-56, permanently at https://doi.org/10.24853/jisi.7.1.49-56. Sign in and open it from this page.

Bibliographic data from OpenAlex (CC0), last checked 19 November 2026. ResearchGuru does not host this paper; once you are signed in, the links open it at the publisher or the repository that does.