Dissertation · 2026 · Open access

Hubungan antara Faktor Individu dan Beban Kerja Fisik terhadap Kelelahan Kerja pada Pekerja Konstruksi Proyek Pembangunan Gedung Parkiran Mall Panakukkang Makassar=The Relationship between Individual Factors and Physical Workload on Work Fatigue in Construction Workers at the Parking Building Construction Project of Mall Panakkukang, Makassar

FARADHIBA FEBRIYANTI

Hasanuddin University Repository · Published 5 May 2026

Open PDFView at the publisherCite this paper

In brief

“Hubungan antara Faktor Individu dan Beban Kerja Fisik terhadap Kelelahan Kerja pada Pekerja Konstruksi Proyek Pembangunan Gedung Parkiran Mall Panakukkang Makassar=The Relationship between Individual Factors and Physical Workload on Work Fatigue in Construction Workers at the Parking Building Construction Project of Mall Panakkukang, Makassar” is a 2026 dissertation by FARADHIBA FEBRIYANTI, published in Hasanuddin University Repository. OpenAlex counts 0 citations as of 19 November 2026. It is open access: the full text is free to read at Hasanuddin University Repository.

Citations
0
Authors
1

Abstract

Latar Belakang: Kelelahan kerja merupakan penurunan efisiensi dan ketahanan kerja akibat penggunaan energi berlebih. Pekerja konstruksi berisiko tinggi mengalami kelelahan karena aktivitas fisik berat dan target proyek yang ketat. Tujuan: Menganalisis hubungan faktor individu (masa kerja, irama sirkadian, IMT) dan beban kerja fisik dengan kelelahan kerja pada pekerja konstruksi Proyek Gedung Parkir Mall Panakkukang Makassar. Metode: Penelitian merupakan observasional analitik dengan pendekatan cross-sectional dan dilakukan mulai dari Januari – Februari 2026. Populasi berjumlah 60 pekerja yang dipilih melalui exhaustive sampling. Data dikumpulkan melalui wawancara (kuesioner SOFI dan MEQ) serta pengukuran langsung (oksimeter, microtoise, timbangan), kemudian dianalisis menggunakan aplikasi SPSS melalui uji Fisher’s Exact. Hasil: Terdapat hubungan signifikan antara irama sirkadian (p=0,022), indeks massa tubuh (p=0,041), dan beban kerja fisik (p=0,009) dengan kelelahan kerja pada pekerja konstruksi di proyek pembangunan gedung parkiran mall Panakkukang Makassar. Sebaliknya, masa kerja (p=0,168) tidak menunjukkan hubungan yang signifikan. Kesimpulan: Irama sirkadian, indeks massa tubuh, dan beban kerja fisik merupakan faktor yang berhubungan dengan kelelahan kerja. Perusahaan disarankan memantau kondisi fisik pekerja secara berkala dan mengatur waktu istirahat yang efektif untuk mencegah beban kerja berlebih serta meminimalisir pemicu kelelahan kerja.

Cite this paper

Formatted from the catalogue record. Check names, capitals and page numbers against the paper before you submit.

APA 7

FEBRIYANTI, F. (2026). Hubungan antara Faktor Individu dan Beban Kerja Fisik terhadap Kelelahan Kerja pada Pekerja Konstruksi Proyek Pembangunan Gedung Parkiran Mall Panakukkang Makassar=The Relationship between Individual Factors and Physical Workload on Work Fatigue in Construction Workers at the Parking Building Construction Project of Mall Panakkukang, Makassar. Hasanuddin University Repository. http://repository.unhas.ac.id/id/eprint/57195/

MLA 9

FEBRIYANTI, FARADHIBA. “Hubungan antara Faktor Individu dan Beban Kerja Fisik terhadap Kelelahan Kerja pada Pekerja Konstruksi Proyek Pembangunan Gedung Parkiran Mall Panakukkang Makassar=The Relationship between Individual Factors and Physical Workload on Work Fatigue in Construction Workers at the Parking Building Construction Project of Mall Panakkukang, Makassar.” Hasanuddin University Repository, 2026. http://repository.unhas.ac.id/id/eprint/57195/.

Chicago

FEBRIYANTI, FARADHIBA. 2026. “Hubungan antara Faktor Individu dan Beban Kerja Fisik terhadap Kelelahan Kerja pada Pekerja Konstruksi Proyek Pembangunan Gedung Parkiran Mall Panakukkang Makassar=The Relationship between Individual Factors and Physical Workload on Work Fatigue in Construction Workers at the Parking Building Construction Project of Mall Panakkukang, Makassar.” Hasanuddin University Repository. http://repository.unhas.ac.id/id/eprint/57195/.

Harvard

FEBRIYANTI, F. (2026) ‘Hubungan antara Faktor Individu dan Beban Kerja Fisik terhadap Kelelahan Kerja pada Pekerja Konstruksi Proyek Pembangunan Gedung Parkiran Mall Panakukkang Makassar=The Relationship between Individual Factors and Physical Workload on Work Fatigue in Construction Workers at the Parking Building Construction Project of Mall Panakkukang, Makassar’, Hasanuddin University Repository. Available at: http://repository.unhas.ac.id/id/eprint/57195/.

IEEE

F. FEBRIYANTI, “Hubungan antara Faktor Individu dan Beban Kerja Fisik terhadap Kelelahan Kerja pada Pekerja Konstruksi Proyek Pembangunan Gedung Parkiran Mall Panakukkang Makassar=The Relationship between Individual Factors and Physical Workload on Work Fatigue in Construction Workers at the Parking Building Construction Project of Mall Panakkukang, Makassar,” Hasanuddin University Repository, 2026.

BibTeX

@phdthesis{febriyanti2026hubungan,
  title     = {{Hubungan antara Faktor Individu dan Beban Kerja Fisik terhadap Kelelahan Kerja pada Pekerja Konstruksi Proyek Pembangunan Gedung Parkiran Mall Panakukkang Makassar=The Relationship between Individual Factors and Physical Workload on Work Fatigue in Construction Workers at the Parking Building Construction Project of Mall Panakkukang, Makassar}},
  author    = {FEBRIYANTI, FARADHIBA},
  year      = {2026},
  url       = {http://repository.unhas.ac.id/id/eprint/57195/}
}

Download for a reference manager: BibTeX (.bib) · RIS for Zotero, Mendeley and EndNote (.ris)

Topic and keywords

Health Sciences › Health Professions › Occupational Therapy › Occupational Health and Safety Management

  • occupational fatigue
  • construction workers
  • physical workload
  • circadian rhythm
  • body mass index
  • work experience
  • occupational health

Work with this paper

Most-cited papers in Health Professions

All highly cited Health Professions papers

Questions about this paper

How do I cite this paper in APA style?

FEBRIYANTI, F. (2026). Hubungan antara Faktor Individu dan Beban Kerja Fisik terhadap Kelelahan Kerja pada Pekerja Konstruksi Proyek Pembangunan Gedung Parkiran Mall Panakukkang Makassar=The Relationship between Individual Factors and Physical Workload on Work Fatigue in Construction Workers at the Parking Building Construction Project of Mall Panakkukang, Makassar. Hasanuddin University Repository. http://repository.unhas.ac.id/id/eprint/57195/

How many times has this paper been cited?

0 times, according to OpenAlex on 19 November 2026. Google Scholar and Scopus count different sets of sources, so their numbers differ.

Is this paper free to read?

Yes. It is open access at Hasanuddin University Repository: sign in and open the PDF from this page.

Who wrote this paper?

FARADHIBA FEBRIYANTI.

Bibliographic data from OpenAlex (CC0), last checked 19 November 2026. ResearchGuru does not host this paper; once you are signed in, the links open it at the publisher or the repository that does.