Dissertation · 2026 · Open access
Hubungan Antara Faktor Individu dan Sistem Kerja Terhadap Kelelahan Kerja pada Pekerja Konstruksi di Proyek Pembangunan Gedung Parkiran Mall Panakkukang Makassar=The Relationship Between Individual Factors and Work System on Work Fatigue Among Construction Workers at the Parking Building Construction Project of Mall Panakkukang Makassar
Hasanuddin University Repository · Published 27 April 2026
In brief
“Hubungan Antara Faktor Individu dan Sistem Kerja Terhadap Kelelahan Kerja pada Pekerja Konstruksi di Proyek Pembangunan Gedung Parkiran Mall Panakkukang Makassar=The Relationship Between Individual Factors and Work System on Work Fatigue Among Construction Workers at the Parking Building Construction Project of Mall Panakkukang Makassar” is a 2026 dissertation by AMANDA PUTRI AYUNINGTYAS, published in Hasanuddin University Repository. OpenAlex counts 0 citations as of 19 November 2026. It is open access: the full text is free to read at Hasanuddin University Repository.
- Citations
- 0
- Authors
- 1
Abstract
Abstrak AMANDA PUTRI AYUNINGTYAS. Hubungan Antara Faktor Individu dan Sistem Kerja Terhadap Kelelahan Kerja pada Pekerja Konstruksi di Proyek Pembangunan Gedung Parkiran Mall Panakkukang Makassar (dibimbing oleh A. Wahyuni, SKM., M.Kes.) Latar Belakang. Kelelahan kerja merupakan salah satu masalah utama pada pekerja konstruksi yang dapat menurunkan kapasitas fisik, konsentrasi, serta meningkatkan risiko kecelakaan kerja. Kondisi pekerjaan konstruksi yang melibatkan aktivitas fisik berat, sistem shift, jam kerja panjang, waktu istirahat yang terbatas, serta kualitas tidur yang tidak optimal dapat memicu terjadinya kelelahan kerja pada pekerja. Tujuan. Penelitian ini bertujuan untuk mengetahui hubungan antara faktor individu (gaya hidup dan kualitas tidur) serta sistem kerja (lama kerja, shift kerja, dan jam istirahat) dengan kelelahan kerja pada pekerja konstruksi di Proyek Pembangunan Gedung Parkiran Mall Panakkukang Makassar.Metode. Penelitian ini menggunakan pendekatan kuantitatif dengan desain cross sectional. Populasi penelitian adalah seluruh pekerja konstruksi sebanyak 60 orang dengan teknik exhaustive sampling (total sampling). Analisis data dilakukan menggunakan uji Fisher’s Exact. Hasil. Terdapat hubungan antara shift kerja (p=0,030), jam istirahat (p=0,040), lama kerja (p=0,040), dan kualitas tidur (p=0,003) dengan kelelahan kerja. Namun, tidak terdapat hubungan antara gaya hidup (p=0,458) dengan kelelahan kerja. Kesimpulan. Faktor sistem kerja dan kualitas tidur memiliki hubungan signifikan dengan kelelahan kerja pada pekerja konstruksi, sedangkan gaya hidup tidak menunjukkan hubungan yang signifikan.
Cite this paper
Formatted from the catalogue record. Check names, capitals and page numbers against the paper before you submit.
APA 7
AYUNINGTYAS, A. P. (2026). Hubungan Antara Faktor Individu dan Sistem Kerja Terhadap Kelelahan Kerja pada Pekerja Konstruksi di Proyek Pembangunan Gedung Parkiran Mall Panakkukang Makassar=The Relationship Between Individual Factors and Work System on Work Fatigue Among Construction Workers at the Parking Building Construction Project of Mall Panakkukang Makassar. Hasanuddin University Repository. http://repository.unhas.ac.id/id/eprint/57204/
MLA 9
AYUNINGTYAS, AMANDA PUTRI. “Hubungan Antara Faktor Individu dan Sistem Kerja Terhadap Kelelahan Kerja pada Pekerja Konstruksi di Proyek Pembangunan Gedung Parkiran Mall Panakkukang Makassar=The Relationship Between Individual Factors and Work System on Work Fatigue Among Construction Workers at the Parking Building Construction Project of Mall Panakkukang Makassar.” Hasanuddin University Repository, 2026. http://repository.unhas.ac.id/id/eprint/57204/.
Chicago
AYUNINGTYAS, AMANDA PUTRI. 2026. “Hubungan Antara Faktor Individu dan Sistem Kerja Terhadap Kelelahan Kerja pada Pekerja Konstruksi di Proyek Pembangunan Gedung Parkiran Mall Panakkukang Makassar=The Relationship Between Individual Factors and Work System on Work Fatigue Among Construction Workers at the Parking Building Construction Project of Mall Panakkukang Makassar.” Hasanuddin University Repository. http://repository.unhas.ac.id/id/eprint/57204/.
Harvard
AYUNINGTYAS, A. P. (2026) ‘Hubungan Antara Faktor Individu dan Sistem Kerja Terhadap Kelelahan Kerja pada Pekerja Konstruksi di Proyek Pembangunan Gedung Parkiran Mall Panakkukang Makassar=The Relationship Between Individual Factors and Work System on Work Fatigue Among Construction Workers at the Parking Building Construction Project of Mall Panakkukang Makassar’, Hasanuddin University Repository. Available at: http://repository.unhas.ac.id/id/eprint/57204/.
IEEE
A. P. AYUNINGTYAS, “Hubungan Antara Faktor Individu dan Sistem Kerja Terhadap Kelelahan Kerja pada Pekerja Konstruksi di Proyek Pembangunan Gedung Parkiran Mall Panakkukang Makassar=The Relationship Between Individual Factors and Work System on Work Fatigue Among Construction Workers at the Parking Building Construction Project of Mall Panakkukang Makassar,” Hasanuddin University Repository, 2026.
BibTeX
@phdthesis{ayuningtyas2026hubungan,
title = {{Hubungan Antara Faktor Individu dan Sistem Kerja Terhadap Kelelahan Kerja pada Pekerja Konstruksi di Proyek Pembangunan Gedung Parkiran Mall Panakkukang Makassar=The Relationship Between Individual Factors and Work System on Work Fatigue Among Construction Workers at the Parking Building Construction Project of Mall Panakkukang Makassar}},
author = {AYUNINGTYAS, AMANDA PUTRI},
year = {2026},
url = {http://repository.unhas.ac.id/id/eprint/57204/}
}
Download for a reference manager: BibTeX (.bib) · RIS for Zotero, Mendeley and EndNote (.ris)
Topic and keywords
Social Sciences › Psychology › Experimental and Cognitive Psychology › Sleep and Work-Related Fatigue
- occupational fatigue
- construction workers
- work systems
- shift work
- working hours
- rest time
- sleep quality
- lifestyle
Work with this paper
Most-cited papers in Psychology
- Diagnostic and Statistical Manual of Mental DisordersAndrés Santiago González Moreno · American Psychiatric Association Publishing eBooks · 2013 · 123,932 citations
- The theory of planned behaviorIcek Ajzen · Organizational Behavior and Human Decision Processes · 1991 · 106,482 citations
- Self-efficacy: Toward a unifying theory of behavioral change.Albert Bandura · Psychological Review · 1977 · 61,923 citations
- Self-determination theory and the facilitation of intrinsic motivation, social development, and well-being.Richard M. Ryan, Edward L. Deci · American Psychologist · 2000 · 55,457 citations
- Mind in Society: The Development of Higher Psychological ProcessesL. S. Vygotsky · 기초학문자료센터(KRM) (Korea Research Foundation) · 1978 · 53,340 citations
Questions about this paper
How do I cite this paper in APA style?
AYUNINGTYAS, A. P. (2026). Hubungan Antara Faktor Individu dan Sistem Kerja Terhadap Kelelahan Kerja pada Pekerja Konstruksi di Proyek Pembangunan Gedung Parkiran Mall Panakkukang Makassar=The Relationship Between Individual Factors and Work System on Work Fatigue Among Construction Workers at the Parking Building Construction Project of Mall Panakkukang Makassar. Hasanuddin University Repository. http://repository.unhas.ac.id/id/eprint/57204/
How many times has this paper been cited?
0 times, according to OpenAlex on 19 November 2026. Google Scholar and Scopus count different sets of sources, so their numbers differ.
Is this paper free to read?
Yes. It is open access at Hasanuddin University Repository: sign in and open the PDF from this page.
Who wrote this paper?
AMANDA PUTRI AYUNINGTYAS.
Bibliographic data from OpenAlex (CC0), last checked 19 November 2026. ResearchGuru does not host this paper; once you are signed in, the links open it at the publisher or the repository that does.