Journal article · 2019 · Open access

Sensitivity of large dengue epidemics in Ecuador to long-lead predictions of El Niño

Desislava Petrova, Rachel Lowe, Anna M. Stewart Ibarra, Joan Ballester, Siem Jan Koopman, Xavier Rodó

Climate Services, 15, 100096 · Published 1 March 2019 · DOI 10.1016/j.cliser.2019.02.003

Open PDFCite this paper

In brief

“Sensitivity of large dengue epidemics in Ecuador to long-lead predictions of El Niño” is a 2019 journal article by Desislava Petrova and 5 co-authors, published in Climate Services. OpenAlex counts 32 citations as of 21 November 2026, which puts it in the top 8% of works published in 2019 by citations. It is open access under a CC BY-NC-ND licence: the full text is free to read at Climate Services.

Citations
32
Most cited in
2022 (8)
Field-weighted impact
1.23
References
62
Authors
6

Abstract

Long-lead forecasts of El Niño events are lacking despite their enormous societal and economic impacts. These climatic events lead to floods and droughts in many tropical regions, and damage agriculture and the economy in poor countries. Due to their impact on local climate, they can also affect human health by increasing the risk of vector-borne diseases, such as dengue fever. Physical processes at the origin of this complex coupled ocean-atmosphere phenomenon are just beginning to be better understood, with subsurface processes and stored heat as two of the main driving forces leading to the development of El Niño in a quasi-periodic manner. Taking advantage of this new knowledge, a statistical dynamic components model, using a state space approach and predictors relevant to the El Niño evolution, was specifically tailored to forecast warm events at lead times of about 2 years (well beyond the traditional spring barrier limit in El Niño predictability). This forecasting scheme provides skilful information on the amplitude of El Niño events, their duration, and the peak time of the sea surface temperature anomalies at a sufficient lead time as to efficiently serve preventive public health actions. The long-lead El Niño predictions were coupled to a statistical dengue model to estimate dengue cases during the 1998 and the 2010 epidemics in El Oro Province in Ecuador, where dengue is hyper-endemic. The dengue model correctly estimated these two largest dengue epidemics even at a 2-year simulation lead time. Thus, information is successfully passed from the El Niño forecast domain to the dengue estimation domain, and the long-lead El Niño predictions are shown to potentially anticipate the magnitude of dengue epidemics in the peak season. The results validate the sensitivity of large dengue epidemics in the region to the El Niño forecasts within the proposed model coupling set-up and imply a potential for increasing lead-time in dengue prediction. This coupled model framework and exploratory analysis, based on El Niño predictions, could be easily extended to other similarly transmitted diseases in tropical and subtropical countries, which are directly and severely affected by the large-scale temperature and precipitation teleconnections occurring before, during and after El Niño events.

Cite this paper

Formatted from the catalogue record. Check names, capitals and page numbers against the paper before you submit.

APA 7

Petrova, D., Lowe, R., Ibarra, A. M. S., Ballester, J., Koopman, S. J., & Rodó, X. (2019). Sensitivity of large dengue epidemics in Ecuador to long-lead predictions of El Niño. Climate Services, 15, 100096. https://doi.org/10.1016/j.cliser.2019.02.003

MLA 9

Petrova, Desislava, et al. “Sensitivity of large dengue epidemics in Ecuador to long-lead predictions of El Niño.” Climate Services, vol. 15, 2019, p. 100096. https://doi.org/10.1016/j.cliser.2019.02.003.

Chicago

Petrova, Desislava, Rachel Lowe, Anna M. Stewart Ibarra, Joan Ballester, Siem Jan Koopman, and Xavier Rodó. 2019. “Sensitivity of large dengue epidemics in Ecuador to long-lead predictions of El Niño.” Climate Services 15: 100096. https://doi.org/10.1016/j.cliser.2019.02.003.

Harvard

Petrova, D. et al. (2019) ‘Sensitivity of large dengue epidemics in Ecuador to long-lead predictions of El Niño’, Climate Services, 15, p. 100096. doi:10.1016/j.cliser.2019.02.003.

IEEE

D. Petrova, R. Lowe, A. M. S. Ibarra, J. Ballester, S. J. Koopman, and X. Rodó, “Sensitivity of large dengue epidemics in Ecuador to long-lead predictions of El Niño,” Climate Services, vol. 15, p. 100096, 2019, doi: 10.1016/j.cliser.2019.02.003.

BibTeX

@article{petrova2019sensitivity,
  title     = {{Sensitivity of large dengue epidemics in Ecuador to long-lead predictions of El Niño}},
  author    = {Petrova, Desislava and Lowe, Rachel and Ibarra, Anna M. Stewart and Ballester, Joan and Koopman, Siem Jan and Rodó, Xavier},
  journal   = {Climate Services},
  year      = {2019},
  volume    = {15},
  pages     = {100096},
  doi       = {10.1016/j.cliser.2019.02.003},
  url       = {https://doi.org/10.1016/j.cliser.2019.02.003}
}

Download for a reference manager: BibTeX (.bib) · RIS for Zotero, Mendeley and EndNote (.ris)

Citations by year

YearCitationsShare of the best year
202044
202122
202288
202344
202444
202566
202644

Its field-weighted citation impact is 1.23: it has been cited 1.23 times as often as the average work of the same field, type and year (1.00 is the world average).

Topic and keywords

Physical Sciences › Environmental Science › Global and Planetary Change › Climate variability and models

  • El Niño
  • long-lead forecasting
  • dengue
  • dengue outbreak
  • state-space model
  • sea surface temperature anomalies
  • ENSO teleconnections
  • El Oro province

Work with this paper

Most-cited papers in Environmental Science

All highly cited Environmental Science papers

Questions about this paper

How do I cite this paper in APA style?

Petrova, D., Lowe, R., Ibarra, A. M. S., Ballester, J., Koopman, S. J., & Rodó, X. (2019). Sensitivity of large dengue epidemics in Ecuador to long-lead predictions of El Niño. Climate Services, 15, 100096. https://doi.org/10.1016/j.cliser.2019.02.003

How many times has this paper been cited?

32 times, according to OpenAlex on 21 November 2026. Google Scholar and Scopus count different sets of sources, so their numbers differ.

Is this paper free to read?

Yes. It is open access at Climate Services: sign in and open the PDF from this page.

Who wrote this paper?

Desislava Petrova, Rachel Lowe, Anna M. Stewart Ibarra, Joan Ballester, Siem Jan Koopman, Xavier Rodó.

What is the DOI of this paper?

10.1016/j.cliser.2019.02.003, permanently at https://doi.org/10.1016/j.cliser.2019.02.003. Sign in and open it from this page.

Bibliographic data from OpenAlex (CC0), last checked 21 November 2026. ResearchGuru does not host this paper; once you are signed in, the links open it at the publisher or the repository that does.