Journal article · 2018

PENERAPAN TOTAL PRODUCTIVE MAINTENANCE DENGAN PENDEKATAN OVERALL EQUIPMENT EFFECTIVENESS (OEE) DAN PENENTUAN KEBIJAKAN MAINTENANCE PADA MESIN RING FRAME DIVISI SPINNING I DI PT PISMA PUTRA TEXTILE

Lilik Haryono, Aries Susanty

Industrial Engineering Online Journal, 6(4) · Published 26 April 2018

View at the publisherCite this paper

In brief

“PENERAPAN TOTAL PRODUCTIVE MAINTENANCE DENGAN PENDEKATAN OVERALL EQUIPMENT EFFECTIVENESS (OEE) DAN PENENTUAN KEBIJAKAN MAINTENANCE PADA MESIN RING FRAME DIVISI SPINNING I DI PT PISMA PUTRA TEXTILE” is a 2018 journal article by Lilik Haryono and Aries Susanty, published in Industrial Engineering Online Journal. OpenAlex counts 7 citations as of 15 November 2026. The publisher's version is not open access, and OpenAlex records no free legal copy.

Citations
7
Most cited in
2022 (3)
Field-weighted impact
0.99
Authors
2

Abstract

Peranan mesin sangat vital pada seluruh proses produksi, sehingga keadaan mesin harus selalu dalam keadaan yang optimal, terutama mesin ring frame karena pada mesin ini terjadi proses perubahan sliver menjadi benang. Tingginya waktu downtime akan berpengaruh terhadap target produksi yang sering tidak tercapai. Pengukuran nilai efisiensi ini hanya memperhatikan target produksi. Untuk mengetahui efisiensi dari… Read the full abstract at the publisher.

Excerpt. This paper is not open access.

Cite this paper

Formatted from the catalogue record. Check names, capitals and page numbers against the paper before you submit.

APA 7

Haryono, L., & Susanty, A. (2018). PENERAPAN TOTAL PRODUCTIVE MAINTENANCE DENGAN PENDEKATAN OVERALL EQUIPMENT EFFECTIVENESS (OEE) DAN PENENTUAN KEBIJAKAN MAINTENANCE PADA MESIN RING FRAME DIVISI SPINNING I DI PT PISMA PUTRA TEXTILE. Industrial Engineering Online Journal, 6(4). https://ejournal3.undip.ac.id/index.php/ieoj/article/view/18274

MLA 9

Haryono, Lilik, and Aries Susanty. “PENERAPAN TOTAL PRODUCTIVE MAINTENANCE DENGAN PENDEKATAN OVERALL EQUIPMENT EFFECTIVENESS (OEE) DAN PENENTUAN KEBIJAKAN MAINTENANCE PADA MESIN RING FRAME DIVISI SPINNING I DI PT PISMA PUTRA TEXTILE.” Industrial Engineering Online Journal, vol. 6, no. 4, 2018. https://ejournal3.undip.ac.id/index.php/ieoj/article/view/18274.

Chicago

Haryono, Lilik and Aries Susanty. 2018. “PENERAPAN TOTAL PRODUCTIVE MAINTENANCE DENGAN PENDEKATAN OVERALL EQUIPMENT EFFECTIVENESS (OEE) DAN PENENTUAN KEBIJAKAN MAINTENANCE PADA MESIN RING FRAME DIVISI SPINNING I DI PT PISMA PUTRA TEXTILE.” Industrial Engineering Online Journal 6 (4). https://ejournal3.undip.ac.id/index.php/ieoj/article/view/18274.

Harvard

Haryono, L. and Susanty, A. (2018) ‘PENERAPAN TOTAL PRODUCTIVE MAINTENANCE DENGAN PENDEKATAN OVERALL EQUIPMENT EFFECTIVENESS (OEE) DAN PENENTUAN KEBIJAKAN MAINTENANCE PADA MESIN RING FRAME DIVISI SPINNING I DI PT PISMA PUTRA TEXTILE’, Industrial Engineering Online Journal, 6(4). Available at: https://ejournal3.undip.ac.id/index.php/ieoj/article/view/18274.

IEEE

L. Haryono and A. Susanty, “PENERAPAN TOTAL PRODUCTIVE MAINTENANCE DENGAN PENDEKATAN OVERALL EQUIPMENT EFFECTIVENESS (OEE) DAN PENENTUAN KEBIJAKAN MAINTENANCE PADA MESIN RING FRAME DIVISI SPINNING I DI PT PISMA PUTRA TEXTILE,” Industrial Engineering Online Journal, vol. 6, no. 4, 2018.

BibTeX

@article{haryono2018penerapan,
  title     = {{PENERAPAN TOTAL PRODUCTIVE MAINTENANCE DENGAN PENDEKATAN OVERALL EQUIPMENT EFFECTIVENESS (OEE) DAN PENENTUAN KEBIJAKAN MAINTENANCE PADA MESIN RING FRAME DIVISI SPINNING I DI PT PISMA PUTRA TEXTILE}},
  author    = {Haryono, Lilik and Susanty, Aries},
  journal   = {Industrial Engineering Online Journal},
  year      = {2018},
  volume    = {6},
  number    = {4},
  url       = {https://ejournal3.undip.ac.id/index.php/ieoj/article/view/18274}
}

Download for a reference manager: BibTeX (.bib) · RIS for Zotero, Mendeley and EndNote (.ris)

Citations by year

YearCitationsShare of the best year
202011
202122
202233
202311

Its field-weighted citation impact is 0.99: it has been cited 0.99 times as often as the average work of the same field, type and year (1.00 is the world average).

Topic and keywords

Social Sciences › Business, Management and Accounting › Strategy and Management › Management and Optimization Techniques

  • total productive maintenance
  • overall equipment effectiveness
  • six big losses
  • spinning
  • maintenance strategy
  • machine downtime
  • availability
  • performance

Work with this paper

Most-cited papers in Business, Management and Accounting

All highly cited Business, Management and Accounting papers

Questions about this paper

How do I cite this paper in APA style?

Haryono, L., & Susanty, A. (2018). PENERAPAN TOTAL PRODUCTIVE MAINTENANCE DENGAN PENDEKATAN OVERALL EQUIPMENT EFFECTIVENESS (OEE) DAN PENENTUAN KEBIJAKAN MAINTENANCE PADA MESIN RING FRAME DIVISI SPINNING I DI PT PISMA PUTRA TEXTILE. Industrial Engineering Online Journal, 6(4). https://ejournal3.undip.ac.id/index.php/ieoj/article/view/18274

How many times has this paper been cited?

7 times, according to OpenAlex on 15 November 2026. Google Scholar and Scopus count different sets of sources, so their numbers differ.

Is this paper free to read?

OpenAlex records no free legal copy. Check your library's access, the authors' pages or a repository, or ask the corresponding author for a copy.

Who wrote this paper?

Lilik Haryono, Aries Susanty.

Bibliographic data from OpenAlex (CC0), last checked 15 November 2026. ResearchGuru does not host this paper; the links go to the publisher or the repository that does.