Journal article · 1994 · Open access
Long-Lead Seasonal Forecasts—Where Do We Stand?
Bulletin of the American Meteorological Society, 75(11), 2097–2114 · Published 1 November 1994 · DOI 10.1175/1520-0477(1994)075<2097:llsfdw>2.0.co;2
In brief
“Long-Lead Seasonal Forecasts—Where Do We Stand?” is a 1994 journal article by Anthony G. Barnston and 12 co-authors, published in Bulletin of the American Meteorological Society. OpenAlex counts 279 citations as of 20 November 2026. It is open access: the full text is free to read at Bulletin of the American Meteorological Society.
- Citations
- 279
- Most cited in
- 2019 (12)
- Field-weighted impact
- 9.62
- References
- 62
- Authors
- 13
Abstract
The National Weather Service intends to begin routinely issuing long-lead forecasts of 3-month mean U. S. temperature and precipitation by the beginning of 1995. The ability to produce useful forecasts for certain seasons and regions at projection times of up to 1 yr is attributed to advances in data observing and processing, computer capability, and physical understanding—particularly, for tropical ocean-atmosphere phenomena. Because much of the skill of the forecasts comes from anomalies of tropical SST related to ENSO, we highlight here long-lead forecasts of the tropical Pacific SST itself, which have higher skill than the U.S forecasts that are made largely on their basis. The performance of five ENSO prediction systems is examined: Two are dynamical [the Cane-Zebiak simple coupled model of Lamont-Doherty Earth Observatory and the nonsimple coupled model of the National Centers for Environmental Prediction (NCEP)]; one is a hybrid coupled model (the Scripps Institution for Oceanography-Max Planck Institute for Meteorology system with a full ocean general circulation model and a statistical atmosphere); and two are statistical (canonical correlation analysis and constructed analogs, used at the Climate Prediction Center of NCEP). With increasing physical understanding, dynamically based forecasts have the potential to become more skillful than purely statistical ones. Currently, however, the two approaches deliver roughly equally skillful forecasts, and the simplest model performs about as well as the more comprehensive models. At a lead time of 6 months (defined here as the time between the end of the latest observed period and the beginning of the predict and period), the SST forecasts have an overall correlation skill in the 0.60s for 1982–93, which easily outperforms persistence and is regarded as useful. Skill for extra-tropical surface climate is this high only in limited regions for certain seasons. Both types of forecasts are not much better than local higher-order autoregressive controls. However, continual progress is being made in understanding relations among global oceanic and atmospheric climate-scale anomaly fields. It is important that more real-time forecasts be made before we rush to judgement. Performance in the real-time setting is the ultimate test of the utility of a long-lead forecast. The National Weather Service's plan to implement new operational long-lead seasonal forecast products demonstrates its effectiveness in identifying and transferring “cutting edge” technologies from theory to applications. This could not have been accomplished without close ties with, and the active cooperation of, the academic and research communities.
Cite this paper
Formatted from the catalogue record. Check names, capitals and page numbers against the paper before you submit.
APA 7
Barnston, A. G., van den Dool, H. M., Rodenhuis, D. R., Ropelewski, C., Kousky, V. E., O’Lenic, E. A., Livezey, R. E., Zebiak, S. E., Cane, M. A., Barnett, T. P., Graham, N. E., Ji, M., & Leetmaa, A. (1994). Long-Lead Seasonal Forecasts—Where Do We Stand? Bulletin of the American Meteorological Society, 75(11), 2097–2114. https://doi.org/10.1175/1520-0477(1994)075<2097:llsfdw>2.0.co;2
MLA 9
Barnston, Anthony G., et al. “Long-Lead Seasonal Forecasts—Where Do We Stand?” Bulletin of the American Meteorological Society, vol. 75, no. 11, 1994, pp. 2097–2114. https://doi.org/10.1175/1520-0477(1994)075<2097:llsfdw>2.0.co;2.
Chicago
Barnston, Anthony G., Huug M. van den Dool, David R. Rodenhuis, Chester Ropelewski, Vernon E. Kousky, Edward A. O’Lenic, Robert E. Livezey, et al. 1994. “Long-Lead Seasonal Forecasts—Where Do We Stand?” Bulletin of the American Meteorological Society 75 (11): 2097–2114. https://doi.org/10.1175/1520-0477(1994)075<2097:llsfdw>2.0.co;2.
Harvard
Barnston, A. G. et al. (1994) ‘Long-Lead Seasonal Forecasts—Where Do We Stand?’, Bulletin of the American Meteorological Society, 75(11), pp. 2097–2114. doi:10.1175/1520-0477(1994)075<2097:llsfdw>2.0.co;2.
IEEE
A. G. Barnston et al., “Long-Lead Seasonal Forecasts—Where Do We Stand?,” Bulletin of the American Meteorological Society, vol. 75, no. 11, pp. 2097–2114, 1994, doi: 10.1175/1520-0477(1994)075<2097:llsfdw>2.0.co;2.
BibTeX
@article{barnston1994long,
title = {{Long-Lead Seasonal Forecasts—Where Do We Stand?}},
author = {Barnston, Anthony G. and van den Dool, Huug M. and Rodenhuis, David R. and Ropelewski, Chester and Kousky, Vernon E. and O’Lenic, Edward A. and Livezey, Robert E. and Zebiak, Stephen E. and Cane, Mark A. and Barnett, Tim P. and Graham, Nicholas E. and Ji, Ming and Leetmaa, Ants},
journal = {Bulletin of the American Meteorological Society},
year = {1994},
volume = {75},
number = {11},
pages = {2097--2114},
doi = {10.1175/1520-0477(1994)075<2097:llsfdw>2.0.co;2},
url = {https://doi.org/10.1175/1520-0477(1994)075<2097:llsfdw>2.0.co;2}
}
Download for a reference manager: BibTeX (.bib) · RIS for Zotero, Mendeley and EndNote (.ris)
Citations by year
| Year | Citations | Share of the best year |
|---|---|---|
| 2017 | 4 | |
| 2018 | 4 | |
| 2019 | 12 | |
| 2020 | 4 | |
| 2021 | 5 | |
| 2022 | 7 | |
| 2023 | 4 | |
| 2024 | 6 | |
| 2025 | 2 | |
| 2026 | 1 |
Its field-weighted citation impact is 9.62: it has been cited 9.62 times as often as the average work of the same field, type and year (1.00 is the world average).
Topic and keywords
Physical Sciences › Environmental Science › Global and Planetary Change › Climate variability and models
- ENSO prediction
- tropical Pacific sea surface temperature
- hybrid coupled model
- canonical correlation analysis
- forecast skill
- tropical ocean-atmosphere interaction
Work with this paper
Most-cited papers in Environmental Science
- Biodiversity hotspots for conservation prioritiesNorman Myers, Russell A. Mittermeier, Cristina Goettsch Mittermeier and 2 more · Nature · 2000 · 32,720 citations
- The Tragedy of the CommonsGarrett Hardin · Science · 1968 · 26,194 citations
- River flow forecasting through conceptual models part I — A discussion of principlesJ.E. Nash, John V. Sutcliffe · Journal of Hydrology · 1970 · 24,625 citations
- The value of the world's ecosystem services and natural capitalRobert Costanza, Ralph C. d’Arge, R.S. de Groot and 10 more · Nature · 1997 · 23,508 citations
- Climate change 2007: the physical science basisSusan Solomon, Dahe Qin, Martin Manning and 5 more · 2007 · 23,383 citations
Questions about this paper
How do I cite this paper in APA style?
Barnston, A. G., van den Dool, H. M., Rodenhuis, D. R., Ropelewski, C., Kousky, V. E., O’Lenic, E. A., Livezey, R. E., Zebiak, S. E., Cane, M. A., Barnett, T. P., Graham, N. E., Ji, M., & Leetmaa, A. (1994). Long-Lead Seasonal Forecasts—Where Do We Stand? Bulletin of the American Meteorological Society, 75(11), 2097–2114. https://doi.org/10.1175/1520-0477(1994)075<2097:llsfdw>2.0.co;2
How many times has this paper been cited?
279 times, according to OpenAlex on 20 November 2026. Google Scholar and Scopus count different sets of sources, so their numbers differ.
Is this paper free to read?
Yes. It is open access at Bulletin of the American Meteorological Society: sign in and open the PDF from this page.
Who wrote this paper?
Anthony G. Barnston, Huug M. van den Dool, David R. Rodenhuis, Chester Ropelewski, Vernon E. Kousky, Edward A. O’Lenic, Robert E. Livezey, Stephen E. Zebiak, Mark A. Cane, Tim P. Barnett, Nicholas E. Graham, Ming Ji and 1 more.
What is the DOI of this paper?
10.1175/1520-0477(1994)075<2097:llsfdw>2.0.co;2, permanently at https://doi.org/10.1175/1520-0477(1994)075<2097:llsfdw>2.0.co;2. Sign in and open it from this page.
Bibliographic data from OpenAlex (CC0), last checked 20 November 2026. ResearchGuru does not host this paper; once you are signed in, the links open it at the publisher or the repository that does.