Journal article · 2009 · Open access
LONG LEAD RAINFALL PREDICTION USING STATISTICAL DOWNSCALING AND ARTIFICIAL NEURAL NETWORK MODELING
Scientia Iranica, 16(2), 165–172 · Published 1 April 2009
In brief
“LONG LEAD RAINFALL PREDICTION USING STATISTICAL DOWNSCALING AND ARTIFICIAL NEURAL NETWORK MODELING” is a 2009 journal article by Mohammad Karamouz and 3 co-authors, published in Scientia Iranica. OpenAlex counts 33 citations as of 21 November 2026. It is open access: the full text is free to read at Scientia Iranica.
- Citations
- 33
- Most cited in
- 2018 (5)
- Field-weighted impact
- 0.78
- References
- 9
- Authors
- 4
Abstract
Long lead rainfall prediction is important in the management and operation of water resources and many models have been developed for this purpose. Each of the developed models has its special strengths and weaknesses that must be considered in real time applications. In this paper, eld and General Circulation Models (GCM) data are used with the Statistical Downscaling Model (SDSM) and the Arti cial Neural Network (ANN) model for long lead rainfall prediction. These models have been used for the prediction of rainfall for 5 months (from December to April) in a study area in the south eastern part of Iran. The SDSM model considers climate change scenarios using the selected climate parameters in rainfall prediction, but the ANN models are driven by observed data and do not consider physical relations between variables. The results show that SDSM outperforms the ANN model.
Cite this paper
Formatted from the catalogue record. Check names, capitals and page numbers against the paper before you submit.
APA 7
Karamouz, Falahi, M., Nazif, S., & Farahani, M. (2009). LONG LEAD RAINFALL PREDICTION USING STATISTICAL DOWNSCALING AND ARTIFICIAL NEURAL NETWORK MODELING. Scientia Iranica, 16(2), 165–172. http://scientiairanica.sharif.edu/article_3190_ffc4462369f8e85c72ce9992bb5a9242.pdf
MLA 9
Karamouz, Mohammad, et al. “LONG LEAD RAINFALL PREDICTION USING STATISTICAL DOWNSCALING AND ARTIFICIAL NEURAL NETWORK MODELING.” Scientia Iranica, vol. 16, no. 2, 2009, pp. 165–172. http://scientiairanica.sharif.edu/article_3190_ffc4462369f8e85c72ce9992bb5a9242.pdf.
Chicago
Karamouz, Mohammad, Mohsen Falahi, Sara Nazif, and Mojtaba Farahani. 2009. “LONG LEAD RAINFALL PREDICTION USING STATISTICAL DOWNSCALING AND ARTIFICIAL NEURAL NETWORK MODELING.” Scientia Iranica 16 (2): 165–172. http://scientiairanica.sharif.edu/article_3190_ffc4462369f8e85c72ce9992bb5a9242.pdf.
Harvard
Karamouz et al. (2009) ‘LONG LEAD RAINFALL PREDICTION USING STATISTICAL DOWNSCALING AND ARTIFICIAL NEURAL NETWORK MODELING’, Scientia Iranica, 16(2), pp. 165–172. Available at: http://scientiairanica.sharif.edu/article_3190_ffc4462369f8e85c72ce9992bb5a9242.pdf.
IEEE
Karamouz, M. Falahi, S. Nazif, and M. Farahani, “LONG LEAD RAINFALL PREDICTION USING STATISTICAL DOWNSCALING AND ARTIFICIAL NEURAL NETWORK MODELING,” Scientia Iranica, vol. 16, no. 2, pp. 165–172, 2009.
BibTeX
@article{karamouz2009long,
title = {{LONG LEAD RAINFALL PREDICTION USING STATISTICAL DOWNSCALING AND ARTIFICIAL NEURAL NETWORK MODELING}},
author = {Karamouz, Mohammad and Falahi, Mohsen and Nazif, Sara and Farahani, Mojtaba},
journal = {Scientia Iranica},
year = {2009},
volume = {16},
number = {2},
pages = {165--172},
url = {http://scientiairanica.sharif.edu/article_3190_ffc4462369f8e85c72ce9992bb5a9242.pdf}
}
Download for a reference manager: BibTeX (.bib) · RIS for Zotero, Mendeley and EndNote (.ris)
Citations by year
| Year | Citations | Share of the best year |
|---|---|---|
| 2016 | 3 | |
| 2018 | 5 | |
| 2019 | 2 | |
| 2020 | 3 | |
| 2021 | 2 | |
| 2022 | 1 | |
| 2023 | 4 | |
| 2024 | 1 | |
| 2025 | 2 | |
| 2026 | 1 |
Its field-weighted citation impact is 0.78: it has been cited 0.78 times as often as the average work of the same field, type and year (1.00 is the world average).
Topic and keywords
Physical Sciences › Environmental Science › Environmental Engineering › Hydrological Forecasting Using AI
- statistical downscaling
- SDSM
- artificial neural networks
- climate change scenarios
- seasonal rainfall forecasting
- water resources management
- model comparison
Work with this paper
Most-cited papers in Environmental Science
- Biodiversity hotspots for conservation prioritiesNorman Myers, Russell A. Mittermeier, Cristina Goettsch Mittermeier and 2 more · Nature · 2000 · 32,720 citations
- The Tragedy of the CommonsGarrett Hardin · Science · 1968 · 26,194 citations
- River flow forecasting through conceptual models part I — A discussion of principlesJ.E. Nash, John V. Sutcliffe · Journal of Hydrology · 1970 · 24,625 citations
- The value of the world's ecosystem services and natural capitalRobert Costanza, Ralph C. d’Arge, R.S. de Groot and 10 more · Nature · 1997 · 23,508 citations
- Climate change 2007: the physical science basisSusan Solomon, Dahe Qin, Martin Manning and 5 more · 2007 · 23,383 citations
Questions about this paper
How do I cite this paper in APA style?
Karamouz, Falahi, M., Nazif, S., & Farahani, M. (2009). LONG LEAD RAINFALL PREDICTION USING STATISTICAL DOWNSCALING AND ARTIFICIAL NEURAL NETWORK MODELING. Scientia Iranica, 16(2), 165–172. http://scientiairanica.sharif.edu/article_3190_ffc4462369f8e85c72ce9992bb5a9242.pdf
How many times has this paper been cited?
33 times, according to OpenAlex on 21 November 2026. Google Scholar and Scopus count different sets of sources, so their numbers differ.
Is this paper free to read?
Yes. It is open access at Scientia Iranica: sign in and open the full text from this page.
Who wrote this paper?
Mohammad Karamouz, Mohsen Falahi, Sara Nazif, Mojtaba Farahani.
Bibliographic data from OpenAlex (CC0), last checked 21 November 2026. ResearchGuru does not host this paper; once you are signed in, the links open it at the publisher or the repository that does.