Journal article · 2020 · Open access
Long-lead Prediction of ENSO Modoki Index using Machine Learning algorithms
Scientific Reports, 10(1), 365 · Published 15 January 2020 · DOI 10.1038/s41598-019-57183-3
In brief
“Long-lead Prediction of ENSO Modoki Index using Machine Learning algorithms” is a 2020 journal article by Manali Pal and 4 co-authors, published in Scientific Reports. OpenAlex counts 51 citations as of 20 November 2026, which puts it in the top 7% of works published in 2020 by citations. It is open access under a CC BY licence: the full text is free to read at Scientific Reports.
- Citations
- 51
- Most cited in
- 2023 (14)
- Field-weighted impact
- 2.16
- References
- 50
- Authors
- 5
Abstract
The focus of this study is to evaluate the efficacy of Machine Learning (ML) algorithms in the long-lead prediction of El Niño (La Niña) Modoki (ENSO Modoki) index (EMI). We evaluated two widely used non-linear ML algorithms namely Support Vector Regression (SVR) and Random Forest (RF) to forecast the EMI at various lead times, viz. 6, 12, 18 and 24 months. The predictors for the EMI are identified using Kendall's tau correlation coefficient between the monthly EMI index and the monthly anomalies of the slowly varying climate variables such as sea surface temperature (SST), sea surface height (SSH) and soil moisture content (SMC). The importance of each of the predictors is evaluated using the Supervised Principal Component Analysis (SPCA). The results indicate both SVR and RF to be capable of forecasting the phase of the EMI realistically at both 6-months and 12-months lead times though the amplitude of the EMI is underestimated for the strong events. The analysis also indicates the SVR to perform better than the RF method in forecasting the EMI.
Cite this paper
Formatted from the catalogue record. Check names, capitals and page numbers against the paper before you submit.
APA 7
Pal, M., Maity, R., Ratnam, J. V., Nonaka, M., & Behera, S. K. (2020). Long-lead Prediction of ENSO Modoki Index using Machine Learning algorithms. Scientific Reports, 10(1), 365. https://doi.org/10.1038/s41598-019-57183-3
MLA 9
Pal, Manali, et al. “Long-lead Prediction of ENSO Modoki Index using Machine Learning algorithms.” Scientific Reports, vol. 10, no. 1, 2020, p. 365. https://doi.org/10.1038/s41598-019-57183-3.
Chicago
Pal, Manali, Rajib Maity, J. V. Ratnam, Masami Nonaka, and Swadhin Kumar Behera. 2020. “Long-lead Prediction of ENSO Modoki Index using Machine Learning algorithms.” Scientific Reports 10 (1): 365. https://doi.org/10.1038/s41598-019-57183-3.
Harvard
Pal, M. et al. (2020) ‘Long-lead Prediction of ENSO Modoki Index using Machine Learning algorithms’, Scientific Reports, 10(1), p. 365. doi:10.1038/s41598-019-57183-3.
IEEE
M. Pal, R. Maity, J. V. Ratnam, M. Nonaka, and S. K. Behera, “Long-lead Prediction of ENSO Modoki Index using Machine Learning algorithms,” Scientific Reports, vol. 10, no. 1, p. 365, 2020, doi: 10.1038/s41598-019-57183-3.
BibTeX
@article{pal2020long,
title = {{Long-lead Prediction of ENSO Modoki Index using Machine Learning algorithms}},
author = {Pal, Manali and Maity, Rajib and Ratnam, J. V. and Nonaka, Masami and Behera, Swadhin Kumar},
journal = {Scientific Reports},
year = {2020},
volume = {10},
number = {1},
pages = {365},
doi = {10.1038/s41598-019-57183-3},
url = {https://doi.org/10.1038/s41598-019-57183-3}
}
Download for a reference manager: BibTeX (.bib) · RIS for Zotero, Mendeley and EndNote (.ris)
Citations by year
| Year | Citations | Share of the best year |
|---|---|---|
| 2020 | 4 | |
| 2021 | 12 | |
| 2022 | 3 | |
| 2023 | 14 | |
| 2024 | 8 | |
| 2025 | 2 | |
| 2026 | 8 |
Its field-weighted citation impact is 2.16: it has been cited 2.16 times as often as the average work of the same field, type and year (1.00 is the world average).
Topic and keywords
Physical Sciences › Environmental Science › Global and Planetary Change › Climate variability and models
- ENSO Modoki
- support vector regression
- random forest
- sea surface temperature anomalies
- sea level anomalies
- soil moisture
- supervised principal component analysis
Work with this paper
Most-cited papers in Environmental Science
- Biodiversity hotspots for conservation prioritiesNorman Myers, Russell A. Mittermeier, Cristina Goettsch Mittermeier and 2 more · Nature · 2000 · 32,720 citations
- The Tragedy of the CommonsGarrett Hardin · Science · 1968 · 26,194 citations
- River flow forecasting through conceptual models part I — A discussion of principlesJ.E. Nash, John V. Sutcliffe · Journal of Hydrology · 1970 · 24,625 citations
- The value of the world's ecosystem services and natural capitalRobert Costanza, Ralph C. d’Arge, R.S. de Groot and 10 more · Nature · 1997 · 23,508 citations
- Climate change 2007: the physical science basisSusan Solomon, Dahe Qin, Martin Manning and 5 more · 2007 · 23,383 citations
Questions about this paper
How do I cite this paper in APA style?
Pal, M., Maity, R., Ratnam, J. V., Nonaka, M., & Behera, S. K. (2020). Long-lead Prediction of ENSO Modoki Index using Machine Learning algorithms. Scientific Reports, 10(1), 365. https://doi.org/10.1038/s41598-019-57183-3
How many times has this paper been cited?
51 times, according to OpenAlex on 20 November 2026. Google Scholar and Scopus count different sets of sources, so their numbers differ.
Is this paper free to read?
Yes. It is open access at Scientific Reports: sign in and open the PDF from this page.
Who wrote this paper?
Manali Pal, Rajib Maity, J. V. Ratnam, Masami Nonaka, Swadhin Kumar Behera.
What is the DOI of this paper?
10.1038/s41598-019-57183-3, permanently at https://doi.org/10.1038/s41598-019-57183-3. Sign in and open it from this page.
Bibliographic data from OpenAlex (CC0), last checked 20 November 2026. ResearchGuru does not host this paper; once you are signed in, the links open it at the publisher or the repository that does.