Preprint · 2026 · Open access
Long-lead predictability of Indian summer monsoon rainfall from the new upgraded version of the monsoon mission coupled forecast system (MMCFSv2)
Research Square · Published 4 July 2026 · DOI 10.21203/rs.3.rs-9565843/v1
In brief
“Long-lead predictability of Indian summer monsoon rainfall from the new upgraded version of the monsoon mission coupled forecast system (MMCFSv2)” is a 2026 preprint by S Lekshmi and 11 co-authors, published in Research Square. OpenAlex counts 0 citations as of 20 November 2026. It is open access under a CC BY licence: the full text is free to read at Research Square.
- Citations
- 0
- Authors
- 12
Abstract
Accurate forecasts of the Indian Summer Monsoon (ISM) are crucial for climate monitoring and operational planning, yet they remain challenging due to model biases and complex land-ice-ocean-atmosphere interactions. The hindcast simulations of the ISM with the latest version of Monsoon Mission Climate Forecast System version 2(MMCFSv2) are assessed at different lead times to evaluate the seasonal skill of ISM at different lead times. Hindcast simulations for 28 years (1998–2024) using 10 ensemble members reveal that the highest ISMR skill (~ 0.72) is achieved with April initialization, with ISMR phase skill improving by 17% and amplitude by 20%. All three tercile (below normal, normal, and above normal) has better representation for April IC. The improvement in ISMR teleconnection with large-scale climate forcing is also noticed. Rainfall anomalies for excess and deficit years composites are better simulated in April IC, followed by February, May, and March IC. The impact of the differing initial conditions on forecast errors varies and provides predictive skill for up to three months, with February initial conditions being particularly crucial. The non-ENSO deficit years in April IC are captured better than in February IC, which is one of the important reasons for the highest ISMR skill. The pattern correlation is highest in April IC as compared to other ICs. MMCFSv2, with April IC having the highest skill shows improved prediction of extreme monsoon years.
Cite this paper
Formatted from the catalogue record. Check names, capitals and page numbers against the paper before you submit.
APA 7
Lekshmi, S., Pillai, P. A., Dhakate, A. R., Bhowmik, M., Das, R. S., Salunke, K., Nellipudi, N. R., Jain, D., Srivastava, A., Pradhan, M., Hazra, A., & Rao, S. A. (2026). Long-lead predictability of Indian summer monsoon rainfall from the new upgraded version of the monsoon mission coupled forecast system (MMCFSv2). Research Square. https://doi.org/10.21203/rs.3.rs-9565843/v1
MLA 9
Lekshmi, S, et al. “Long-lead predictability of Indian summer monsoon rainfall from the new upgraded version of the monsoon mission coupled forecast system (MMCFSv2).” Research Square, 2026. https://doi.org/10.21203/rs.3.rs-9565843/v1.
Chicago
Lekshmi, S, Prasanth A. Pillai, Ashish R. Dhakate, Moumita Bhowmik, Renu S. Das, Kiran Salunke, Nanaji Rao Nellipudi, et al. 2026. “Long-lead predictability of Indian summer monsoon rainfall from the new upgraded version of the monsoon mission coupled forecast system (MMCFSv2).” Research Square. https://doi.org/10.21203/rs.3.rs-9565843/v1.
Harvard
Lekshmi, S. et al. (2026) ‘Long-lead predictability of Indian summer monsoon rainfall from the new upgraded version of the monsoon mission coupled forecast system (MMCFSv2)’, Research Square. doi:10.21203/rs.3.rs-9565843/v1.
IEEE
S. Lekshmi et al., “Long-lead predictability of Indian summer monsoon rainfall from the new upgraded version of the monsoon mission coupled forecast system (MMCFSv2),” Research Square, 2026, doi: 10.21203/rs.3.rs-9565843/v1.
BibTeX
@misc{lekshmi2026long,
title = {{Long-lead predictability of Indian summer monsoon rainfall from the new upgraded version of the monsoon mission coupled forecast system (MMCFSv2)}},
author = {Lekshmi, S and Pillai, Prasanth A. and Dhakate, Ashish R. and Bhowmik, Moumita and Das, Renu S. and Salunke, Kiran and Nellipudi, Nanaji Rao and Jain, Deepeshkumar and Srivastava, Ankur and Pradhan, Maheswar and Hazra, Anupam and Rao, Suryachandra A.},
howpublished = {Research Square},
year = {2026},
doi = {10.21203/rs.3.rs-9565843/v1},
url = {https://doi.org/10.21203/rs.3.rs-9565843/v1}
}
Download for a reference manager: BibTeX (.bib) · RIS for Zotero, Mendeley and EndNote (.ris)
Topic and keywords
Physical Sciences › Environmental Science › Global and Planetary Change › Climate variability and models
- Indian summer monsoon rainfall
- seasonal forecasting
- hindcast simulation
- ENSO
- monsoon teleconnections
Work with this paper
Most-cited papers in Environmental Science
- Biodiversity hotspots for conservation prioritiesNorman Myers, Russell A. Mittermeier, Cristina Goettsch Mittermeier and 2 more · Nature · 2000 · 32,720 citations
- The Tragedy of the CommonsGarrett Hardin · Science · 1968 · 26,194 citations
- River flow forecasting through conceptual models part I — A discussion of principlesJ.E. Nash, John V. Sutcliffe · Journal of Hydrology · 1970 · 24,625 citations
- The value of the world's ecosystem services and natural capitalRobert Costanza, Ralph C. d’Arge, R.S. de Groot and 10 more · Nature · 1997 · 23,508 citations
- Climate change 2007: the physical science basisSusan Solomon, Dahe Qin, Martin Manning and 5 more · 2007 · 23,383 citations
Questions about this paper
How do I cite this paper in APA style?
Lekshmi, S., Pillai, P. A., Dhakate, A. R., Bhowmik, M., Das, R. S., Salunke, K., Nellipudi, N. R., Jain, D., Srivastava, A., Pradhan, M., Hazra, A., & Rao, S. A. (2026). Long-lead predictability of Indian summer monsoon rainfall from the new upgraded version of the monsoon mission coupled forecast system (MMCFSv2). Research Square. https://doi.org/10.21203/rs.3.rs-9565843/v1
How many times has this paper been cited?
0 times, according to OpenAlex on 20 November 2026. Google Scholar and Scopus count different sets of sources, so their numbers differ.
Is this paper free to read?
Yes. It is open access at Research Square: sign in and open the full text from this page.
Who wrote this paper?
S Lekshmi, Prasanth A. Pillai, Ashish R. Dhakate, Moumita Bhowmik, Renu S. Das, Kiran Salunke, Nanaji Rao Nellipudi, Deepeshkumar Jain, Ankur Srivastava, Maheswar Pradhan, Anupam Hazra, Suryachandra A. Rao.
What is the DOI of this paper?
10.21203/rs.3.rs-9565843/v1, permanently at https://doi.org/10.21203/rs.3.rs-9565843/v1. Sign in and open it from this page.
Bibliographic data from OpenAlex (CC0), last checked 20 November 2026. ResearchGuru does not host this paper; once you are signed in, the links open it at the publisher or the repository that does.