Journal article · 1996 · Open access
Long-Lead Forecasts of Seasonal Precipitation in the Tropical Pacific Islands Using CCA
Journal of Climate, 9(9), 2020–2035 · Published 1 September 1996 · DOI 10.1175/1520-0442(1996)009<2020:llfosp>2.0.co;2
In brief
“Long-Lead Forecasts of Seasonal Precipitation in the Tropical Pacific Islands Using CCA” is a 1996 journal article by Yuxiang He and Anthony G. Barnston, published in Journal of Climate. OpenAlex counts 51 citations as of 25 November 2026. It is open access: the full text is free to read at Journal of Climate.
- Citations
- 51
- Most cited in
- 2021 (3)
- Field-weighted impact
- 2.51
- Authors
- 2
Abstract
A potentially operational system for 3-month total precipitation forecasts for island stations in the tropical Pacific has been developed at NOAA's Climate Prediction Center using the statistical method of canonical correlation analysis (CCA). Routine issuance of the forecasts could begin during 1996, presently they are issued experimentally. The levels and sources of predictive skills have been estimated at lead times of up to one year, using a cross-validation design. The predictor fields, in order of their predictive value, are quasi-global sea surface temperature, Northern Hemisphere 700-mb height, and prior values of the predictand precipitation itself. Four consecutive 3-nionth predictor periods are used to detect evolving as well as steady-state conditions. Modest forecast skills are realized for most seasons of the year; however, moderate skills (correlation <0.5) are found for certain stations in the northern Tropics at lead times of 3 months or less in late northern winter, especially in the western Pacific. CCA generally outperforms persistence, even at short leads. The El Niñto-Southern Oscillation (ENSO) phenomenon is found to play the dominant role in the precipitation variability at many tropical Pacific islands. During especially the late northern winter of mature warm (cold) episodes, pre- cipitation is suppressed (enhanced) in a horwshoe-shaped region surrounding (to the north, west, south) the central and eastern equatorial zone. which is anomalously wet (dry). A secondary source of predictive skill, most important for northern summer, is a pattern with like-signed SST anomalies over the Tropics of all three ocean basins. While this pattern may encompass ENSO episodes, it varies at lower frequencies than the ENSO phenomenon on its own.
Cite this paper
Formatted from the catalogue record. Check names, capitals and page numbers against the paper before you submit.
APA 7
He, Y., & Barnston, A. G. (1996). Long-Lead Forecasts of Seasonal Precipitation in the Tropical Pacific Islands Using CCA. Journal of Climate, 9(9), 2020–2035. https://doi.org/10.1175/1520-0442(1996)009<2020:llfosp>2.0.co;2
MLA 9
He, Yuxiang, and Anthony G. Barnston. “Long-Lead Forecasts of Seasonal Precipitation in the Tropical Pacific Islands Using CCA.” Journal of Climate, vol. 9, no. 9, 1996, pp. 2020–2035. https://doi.org/10.1175/1520-0442(1996)009<2020:llfosp>2.0.co;2.
Chicago
He, Yuxiang and Anthony G. Barnston. 1996. “Long-Lead Forecasts of Seasonal Precipitation in the Tropical Pacific Islands Using CCA.” Journal of Climate 9 (9): 2020–2035. https://doi.org/10.1175/1520-0442(1996)009<2020:llfosp>2.0.co;2.
Harvard
He, Y. and Barnston, A. G. (1996) ‘Long-Lead Forecasts of Seasonal Precipitation in the Tropical Pacific Islands Using CCA’, Journal of Climate, 9(9), pp. 2020–2035. doi:10.1175/1520-0442(1996)009<2020:llfosp>2.0.co;2.
IEEE
Y. He and A. G. Barnston, “Long-Lead Forecasts of Seasonal Precipitation in the Tropical Pacific Islands Using CCA,” Journal of Climate, vol. 9, no. 9, pp. 2020–2035, 1996, doi: 10.1175/1520-0442(1996)009<2020:llfosp>2.0.co;2.
BibTeX
@article{he1996long,
title = {{Long-Lead Forecasts of Seasonal Precipitation in the Tropical Pacific Islands Using CCA}},
author = {He, Yuxiang and Barnston, Anthony G.},
journal = {Journal of Climate},
year = {1996},
volume = {9},
number = {9},
pages = {2020--2035},
doi = {10.1175/1520-0442(1996)009<2020:llfosp>2.0.co;2},
url = {https://doi.org/10.1175/1520-0442(1996)009<2020:llfosp>2.0.co;2}
}
Download for a reference manager: BibTeX (.bib) · RIS for Zotero, Mendeley and EndNote (.ris)
Citations by year
| Year | Citations | Share of the best year |
|---|---|---|
| 2012 | 2 | |
| 2013 | 2 | |
| 2015 | 2 | |
| 2019 | 1 | |
| 2020 | 1 | |
| 2021 | 3 | |
| 2022 | 2 | |
| 2023 | 2 | |
| 2025 | 2 |
Its field-weighted citation impact is 2.51: it has been cited 2.51 times as often as the average work of the same field, type and year (1.00 is the world average).
Topic and keywords
Physical Sciences › Environmental Science › Global and Planetary Change › Climate variability and models
- seasonal rainfall forecasting
- tropical Pacific islands
- canonical correlation analysis
- ENSO
- sea surface temperature anomalies
- predictability
- forecast skill
- cross-validation
Work with this paper
Most-cited papers in Environmental Science
- Biodiversity hotspots for conservation prioritiesNorman Myers, Russell A. Mittermeier, Cristina Goettsch Mittermeier and 2 more · Nature · 2000 · 32,720 citations
- The Tragedy of the CommonsGarrett Hardin · Science · 1968 · 26,194 citations
- River flow forecasting through conceptual models part I — A discussion of principlesJ.E. Nash, John V. Sutcliffe · Journal of Hydrology · 1970 · 24,625 citations
- The value of the world's ecosystem services and natural capitalRobert Costanza, Ralph C. d’Arge, R.S. de Groot and 10 more · Nature · 1997 · 23,508 citations
- Climate change 2007: the physical science basisSusan Solomon, Dahe Qin, Martin Manning and 5 more · 2007 · 23,383 citations
Questions about this paper
How do I cite this paper in APA style?
He, Y., & Barnston, A. G. (1996). Long-Lead Forecasts of Seasonal Precipitation in the Tropical Pacific Islands Using CCA. Journal of Climate, 9(9), 2020–2035. https://doi.org/10.1175/1520-0442(1996)009<2020:llfosp>2.0.co;2
How many times has this paper been cited?
51 times, according to OpenAlex on 25 November 2026. Google Scholar and Scopus count different sets of sources, so their numbers differ.
Is this paper free to read?
Yes. It is open access at Journal of Climate: sign in and open the PDF from this page.
Who wrote this paper?
Yuxiang He, Anthony G. Barnston.
What is the DOI of this paper?
10.1175/1520-0442(1996)009<2020:llfosp>2.0.co;2, permanently at https://doi.org/10.1175/1520-0442(1996)009<2020:llfosp>2.0.co;2. Sign in and open it from this page.
Bibliographic data from OpenAlex (CC0), last checked 25 November 2026. ResearchGuru does not host this paper; once you are signed in, the links open it at the publisher or the repository that does.