Journal article · 2016 · Open access

Improving the long-lead predictability of El Niño using a novel forecasting scheme based on a dynamic components model

Desislava Petrova, Siem Jan Koopman, Joan Ballester, Xavier Rodó

Climate Dynamics, 48(3-4), 1249–1276 · Published 2 May 2016 · DOI 10.1007/s00382-016-3139-y

Open full textView at the publisherCite this paper

In brief

“Improving the long-lead predictability of El Niño using a novel forecasting scheme based on a dynamic components model” is a 2016 journal article by Desislava Petrova and 3 co-authors, published in Climate Dynamics. OpenAlex counts 43 citations as of 20 November 2026, which puts it in the top 8% of works published in 2016 by citations. It is open access: the full text is free to read at VU Research Portal.

Citations
43
Most cited in
2017 (6)
Field-weighted impact
2.79
References
86
Authors
4

Cite this paper

Formatted from the catalogue record. Check names, capitals and page numbers against the paper before you submit.

APA 7

Petrova, D., Koopman, S. J., Ballester, J., & Rodó, X. (2016). Improving the long-lead predictability of El Niño using a novel forecasting scheme based on a dynamic components model. Climate Dynamics, 48(3-4), 1249–1276. https://doi.org/10.1007/s00382-016-3139-y

MLA 9

Petrova, Desislava, et al. “Improving the long-lead predictability of El Niño using a novel forecasting scheme based on a dynamic components model.” Climate Dynamics, vol. 48, no. 3-4, 2016, pp. 1249–1276. https://doi.org/10.1007/s00382-016-3139-y.

Chicago

Petrova, Desislava, Siem Jan Koopman, Joan Ballester, and Xavier Rodó. 2016. “Improving the long-lead predictability of El Niño using a novel forecasting scheme based on a dynamic components model.” Climate Dynamics 48 (3-4): 1249–1276. https://doi.org/10.1007/s00382-016-3139-y.

Harvard

Petrova, D. et al. (2016) ‘Improving the long-lead predictability of El Niño using a novel forecasting scheme based on a dynamic components model’, Climate Dynamics, 48(3-4), pp. 1249–1276. doi:10.1007/s00382-016-3139-y.

IEEE

D. Petrova, S. J. Koopman, J. Ballester, and X. Rodó, “Improving the long-lead predictability of El Niño using a novel forecasting scheme based on a dynamic components model,” Climate Dynamics, vol. 48, no. 3-4, pp. 1249–1276, 2016, doi: 10.1007/s00382-016-3139-y.

BibTeX

@article{petrova2016improving,
  title     = {{Improving the long-lead predictability of El Niño using a novel forecasting scheme based on a dynamic components model}},
  author    = {Petrova, Desislava and Koopman, Siem Jan and Ballester, Joan and Rodó, Xavier},
  journal   = {Climate Dynamics},
  year      = {2016},
  volume    = {48},
  number    = {3-4},
  pages     = {1249--1276},
  doi       = {10.1007/s00382-016-3139-y},
  url       = {https://doi.org/10.1007/s00382-016-3139-y}
}

Download for a reference manager: BibTeX (.bib) · RIS for Zotero, Mendeley and EndNote (.ris)

Citations by year

YearCitationsShare of the best year
201766
201866
201966
202022
202133
202255
202333
202433
202533
202633

Its field-weighted citation impact is 2.79: it has been cited 2.79 times as often as the average work of the same field, type and year (1.00 is the world average).

Topic and keywords

Physical Sciences › Environmental Science › Global and Planetary Change › Climate variability and models

  • El Niño
  • ENSO forecasting
  • unobserved components model
  • structural time series models
  • state-space model
  • Kalman filter
  • subsurface ocean temperature
  • equatorial Pacific

Work with this paper

Most-cited papers in Environmental Science

All highly cited Environmental Science papers

Questions about this paper

How do I cite this paper in APA style?

Petrova, D., Koopman, S. J., Ballester, J., & Rodó, X. (2016). Improving the long-lead predictability of El Niño using a novel forecasting scheme based on a dynamic components model. Climate Dynamics, 48(3-4), 1249–1276. https://doi.org/10.1007/s00382-016-3139-y

How many times has this paper been cited?

43 times, according to OpenAlex on 20 November 2026. Google Scholar and Scopus count different sets of sources, so their numbers differ.

Is this paper free to read?

Yes. It is open access at VU Research Portal: sign in and open the full text from this page.

Who wrote this paper?

Desislava Petrova, Siem Jan Koopman, Joan Ballester, Xavier Rodó.

What is the DOI of this paper?

10.1007/s00382-016-3139-y, permanently at https://doi.org/10.1007/s00382-016-3139-y. Sign in and open it from this page.

Bibliographic data from OpenAlex (CC0), last checked 20 November 2026. ResearchGuru does not host this paper; once you are signed in, the links open it at the publisher or the repository that does.