Paper · 2016
Hubungan Kelelahan Kerja dengan Produktivitas Kerja pada Pekerja Bagian Produksi Tulangan Beton di PT Wijaya Karya Beton Medan Tahun 2015
Published 4 April 2016
In brief
“Hubungan Kelelahan Kerja dengan Produktivitas Kerja pada Pekerja Bagian Produksi Tulangan Beton di PT Wijaya Karya Beton Medan Tahun 2015” is a 2016 paper by hengki putra simanulang and 2 co-authors. OpenAlex counts 4 citations as of 19 November 2026. The publisher's version is not open access, and OpenAlex records no free legal copy.
- Citations
- 4
- Most cited in
- 2022 (2)
- Authors
- 3
Abstract
Work fatique affects a work energy depression and body endurance weakening to work, and also causes workers to stop their works and take rest time. This research had aim to know correlation between work fatique with work productivity in PT.Wijaya Karya Beton Medan wire caging section. The design of this research was analytic with cross… Read the full abstract at the publisher.
Excerpt. This paper is not open access.
Cite this paper
Formatted from the catalogue record. Check names, capitals and page numbers against the paper before you submit.
APA 7
simanulang, H. P., sinaga, M., & Mahyuni, E. L. (2016). Hubungan Kelelahan Kerja dengan Produktivitas Kerja pada Pekerja Bagian Produksi Tulangan Beton di PT Wijaya Karya Beton Medan Tahun 2015. https://www.neliti.com/publications/14604/hubungan-kelelahan-kerja-dengan-produktivitas-kerja-pada-pekerja-bagian-produksi
MLA 9
simanulang, hengki putra, et al. “Hubungan Kelelahan Kerja dengan Produktivitas Kerja pada Pekerja Bagian Produksi Tulangan Beton di PT Wijaya Karya Beton Medan Tahun 2015.” vol. 4, no. 3, 2016, p. 14604. https://www.neliti.com/publications/14604/hubungan-kelelahan-kerja-dengan-produktivitas-kerja-pada-pekerja-bagian-produksi.
Chicago
simanulang, hengki putra, makmur sinaga, and Eka Lestari Mahyuni. 2016. “Hubungan Kelelahan Kerja dengan Produktivitas Kerja pada Pekerja Bagian Produksi Tulangan Beton di PT Wijaya Karya Beton Medan Tahun 2015.” https://www.neliti.com/publications/14604/hubungan-kelelahan-kerja-dengan-produktivitas-kerja-pada-pekerja-bagian-produksi.
Harvard
simanulang, H. P., sinaga, M. and Mahyuni, E. L. (2016) ‘Hubungan Kelelahan Kerja dengan Produktivitas Kerja pada Pekerja Bagian Produksi Tulangan Beton di PT Wijaya Karya Beton Medan Tahun 2015’. Available at: https://www.neliti.com/publications/14604/hubungan-kelelahan-kerja-dengan-produktivitas-kerja-pada-pekerja-bagian-produksi.
IEEE
H. P. simanulang, M. sinaga, and E. L. Mahyuni, “Hubungan Kelelahan Kerja dengan Produktivitas Kerja pada Pekerja Bagian Produksi Tulangan Beton di PT Wijaya Karya Beton Medan Tahun 2015,” vol. 4, no. 3, p. 14604, 2016.
BibTeX
@article{simanulang2016hubungan,
title = {{Hubungan Kelelahan Kerja dengan Produktivitas Kerja pada Pekerja Bagian Produksi Tulangan Beton di PT Wijaya Karya Beton Medan Tahun 2015}},
author = {simanulang, hengki putra and sinaga, makmur and Mahyuni, Eka Lestari},
year = {2016},
volume = {4},
number = {3},
pages = {14604},
url = {https://www.neliti.com/publications/14604/hubungan-kelelahan-kerja-dengan-produktivitas-kerja-pada-pekerja-bagian-produksi}
}
Download for a reference manager: BibTeX (.bib) · RIS for Zotero, Mendeley and EndNote (.ris)
Citations by year
| Year | Citations | Share of the best year |
|---|---|---|
| 2020 | 1 | |
| 2021 | 1 | |
| 2022 | 2 |
Topic and keywords
Health Sciences › Health Professions › Occupational Therapy › Occupational Health and Safety Management
- occupational fatigue
- labor productivity
- construction workers
- fatigue questionnaire
- rest breaks
Work with this paper
Most-cited papers in Health Professions
- DETERMINATION OF SERUM PROTEINS BY MEANS OF THE BIURET REACTIONAllan Godfrey Gornall, Charles J. Bardawill, Maxima M. David · Journal of Biological Chemistry · 1949 · 16,172 citations
- Fostering implementation of health services research findings into practice: a consolidated framework for advancing implementation scienceLaura J. Damschroder, David Clark Aron, Rosalind E. Keith and 3 more · Implementation Science · 2009 · 15,527 citations
- FUNCTIONAL EVALUATION: THE BARTHEL INDEX.FLORENCE I. MAHONEY, DOROTHEA W. BARTHEL · PubMed · 1965 · 15,488 citations
- The Timed “Up & Go”: A Test of Basic Functional Mobility for Frail Elderly PersonsDiane Podsiadlo, Sandra Richardson · Journal of the American Geriatrics Society · 1991 · 15,001 citations
- National Committee for Clinical Laboratory StandardsErika Bruck · PEDIATRICS · 1980 · 14,735 citations
Questions about this paper
How do I cite this paper in APA style?
simanulang, H. P., sinaga, M., & Mahyuni, E. L. (2016). Hubungan Kelelahan Kerja dengan Produktivitas Kerja pada Pekerja Bagian Produksi Tulangan Beton di PT Wijaya Karya Beton Medan Tahun 2015. https://www.neliti.com/publications/14604/hubungan-kelelahan-kerja-dengan-produktivitas-kerja-pada-pekerja-bagian-produksi
How many times has this paper been cited?
4 times, according to OpenAlex on 19 November 2026. Google Scholar and Scopus count different sets of sources, so their numbers differ.
Is this paper free to read?
OpenAlex records no free legal copy. Check your library's access, the authors' pages or a repository, or ask the corresponding author for a copy.
Who wrote this paper?
hengki putra simanulang, makmur sinaga, Eka Lestari Mahyuni.
Bibliographic data from OpenAlex (CC0), last checked 19 November 2026. ResearchGuru does not host this paper; once you are signed in, the links open it at the publisher or the repository that does.