Journal article · 2023 · Open access

Downscaling long lead time daily rainfall ensemble forecasts through deep learning

Huidong Jin, Weifan Jiang, Minzhe Chen, Ming Li, K. Shuvo Bakar, Quanxi Shao

Stochastic Environmental Research and Risk Assessment, 37(8), 3185–3203 · Published 14 April 2023 · DOI 10.1007/s00477-023-02444-x

Open PDFView at the publisherCite this paper

In brief

“Downscaling long lead time daily rainfall ensemble forecasts through deep learning” is a 2023 journal article by Huidong Jin and 5 co-authors, published in Stochastic Environmental Research and Risk Assessment. OpenAlex counts 23 citations as of 21 November 2026, which puts it in the top 7% of works published in 2023 by citations. It is open access under a CC BY licence: the full text is free to read at Stochastic Environmental Research and Risk Assessment.

Citations
23
Most cited in
2024 (10)
Field-weighted impact
1.65
References
42
Authors
6

Abstract

Skilful and localised daily weather forecasts for upcoming seasons are desired by climate-sensitive sectors. Various General circulation models routinely provide such long lead time ensemble forecasts, also known as seasonal climate forecasts (SCF), but require downscaling techniques to enhance their skills from historical observations. Traditional downscaling techniques, like quantile mapping (QM), learn empirical relationships from pre-engineered predictors. Deep-learning-based downscaling techniques automatically generate and select predictors but almost all of them focus on simplified situations where low-resolution images match well with high-resolution ones, which is not the case in ensemble forecasts. To downscale ensemble rainfall forecasts, we take a two-step procedure. We first choose a suitable deep learning model, very deep super-resolution (VDSR), from several outstanding candidates, based on an ensemble forecast skill metric, continuous ranked probability score (CRPS). Secondly, via incorporating other climate variables as extra input, we develop and finalise a very deep statistical downscaling (VDSD) model based on CRPS. Both VDSR and VDSD are tested on downscaling 60 km rainfall forecasts from the Australian Community Climate and Earth-System Simulator Seasonal model version 1 (ACCESS-S1) to 12 km with lead times up to 217 days. Leave-one-year-out testing results illustrate that VDSD has normally higher forecast accuracy and skill, measured by mean absolute error and CRPS respectively, than VDSR and QM. VDSD substantially improves ACCESS-S1 raw forecasts but does not always outperform climatology, a benchmark for SCFs. Many more research efforts are required on downscaling and climate modelling for skilful SCFs.

Cite this paper

Formatted from the catalogue record. Check names, capitals and page numbers against the paper before you submit.

APA 7

Jin, H., Jiang, W., Chen, M., Li, M., Bakar, K. S., & Shao, Q. (2023). Downscaling long lead time daily rainfall ensemble forecasts through deep learning. Stochastic Environmental Research and Risk Assessment, 37(8), 3185–3203. https://doi.org/10.1007/s00477-023-02444-x

MLA 9

Jin, Huidong, et al. “Downscaling long lead time daily rainfall ensemble forecasts through deep learning.” Stochastic Environmental Research and Risk Assessment, vol. 37, no. 8, 2023, pp. 3185–3203. https://doi.org/10.1007/s00477-023-02444-x.

Chicago

Jin, Huidong, Weifan Jiang, Minzhe Chen, Ming Li, K. Shuvo Bakar, and Quanxi Shao. 2023. “Downscaling long lead time daily rainfall ensemble forecasts through deep learning.” Stochastic Environmental Research and Risk Assessment 37 (8): 3185–3203. https://doi.org/10.1007/s00477-023-02444-x.

Harvard

Jin, H. et al. (2023) ‘Downscaling long lead time daily rainfall ensemble forecasts through deep learning’, Stochastic Environmental Research and Risk Assessment, 37(8), pp. 3185–3203. doi:10.1007/s00477-023-02444-x.

IEEE

H. Jin, W. Jiang, M. Chen, M. Li, K. S. Bakar, and Q. Shao, “Downscaling long lead time daily rainfall ensemble forecasts through deep learning,” Stochastic Environmental Research and Risk Assessment, vol. 37, no. 8, pp. 3185–3203, 2023, doi: 10.1007/s00477-023-02444-x.

BibTeX

@article{jin2023downscaling,
  title     = {{Downscaling long lead time daily rainfall ensemble forecasts through deep learning}},
  author    = {Jin, Huidong and Jiang, Weifan and Chen, Minzhe and Li, Ming and Bakar, K. Shuvo and Shao, Quanxi},
  journal   = {Stochastic Environmental Research and Risk Assessment},
  year      = {2023},
  volume    = {37},
  number    = {8},
  pages     = {3185--3203},
  doi       = {10.1007/s00477-023-02444-x},
  url       = {https://doi.org/10.1007/s00477-023-02444-x}
}

Download for a reference manager: BibTeX (.bib) · RIS for Zotero, Mendeley and EndNote (.ris)

Citations by year

YearCitationsShare of the best year
202322
20241010
202555
202666

Its field-weighted citation impact is 1.65: it has been cited 1.65 times as often as the average work of the same field, type and year (1.00 is the world average).

Topic and keywords

Physical Sciences › Environmental Science › Global and Planetary Change › Climate variability and models

  • seasonal climate forecasting
  • rainfall downscaling
  • ensemble forecasting
  • continuous ranked probability score
  • general circulation model output
  • deep learning
  • quantile mapping

Work with this paper

Most-cited papers in Environmental Science

All highly cited Environmental Science papers

Questions about this paper

How do I cite this paper in APA style?

Jin, H., Jiang, W., Chen, M., Li, M., Bakar, K. S., & Shao, Q. (2023). Downscaling long lead time daily rainfall ensemble forecasts through deep learning. Stochastic Environmental Research and Risk Assessment, 37(8), 3185–3203. https://doi.org/10.1007/s00477-023-02444-x

How many times has this paper been cited?

23 times, according to OpenAlex on 21 November 2026. Google Scholar and Scopus count different sets of sources, so their numbers differ.

Is this paper free to read?

Yes. It is open access at Stochastic Environmental Research and Risk Assessment: sign in and open the PDF from this page.

Who wrote this paper?

Huidong Jin, Weifan Jiang, Minzhe Chen, Ming Li, K. Shuvo Bakar, Quanxi Shao.

What is the DOI of this paper?

10.1007/s00477-023-02444-x, permanently at https://doi.org/10.1007/s00477-023-02444-x. Sign in and open it from this page.

Bibliographic data from OpenAlex (CC0), last checked 21 November 2026. ResearchGuru does not host this paper; once you are signed in, the links open it at the publisher or the repository that does.