Conference paper · 2026
Collaborative Opportunistic Maintenance Scheduling for Offshore Wind Farms Considering Cognitive Correction
International Conference on Neural Networks, Information and Communication Engineering (NNICE), 1469–1473 · Published 23 January 2026 · DOI 10.1109/nnice68970.2026.11466238
In brief
“Collaborative Opportunistic Maintenance Scheduling for Offshore Wind Farms Considering Cognitive Correction” is a 2026 conference paper by Chengze Rong and 3 co-authors, published in International Conference on Neural Networks, Information and Communication Engineering (NNICE). OpenAlex counts 0 citations as of 19 November 2026. The publisher's version is not open access, and OpenAlex records no free legal copy.
- Citations
- 0
- References
- 6
- Authors
- 4
Abstract
High operation and maintenance (O&M) costs and harsh marine environments pose significant challenges to offshore wind farms (OWFs). Existing maintenance strategies often rely on imperfect state information, leading to sub-optimal scheduling. To address these issues, this paper proposes a dynamic collaborative O&M scheduling framework utilizing a heterogeneous fleet of Crew Transfer Vessels (CTVs) and Unmanned… Read the full abstract at the publisher.
Excerpt. This paper is not open access.
Cite this paper
Formatted from the catalogue record. Check names, capitals and page numbers against the paper before you submit.
APA 7
Rong, C., Xiao, Z., Xue, L., & Wu, Z. (2026). Collaborative Opportunistic Maintenance Scheduling for Offshore Wind Farms Considering Cognitive Correction. International Conference on Neural Networks, Information and Communication Engineering (NNICE), 1469–1473. https://doi.org/10.1109/nnice68970.2026.11466238
MLA 9
Rong, Chengze, et al. “Collaborative Opportunistic Maintenance Scheduling for Offshore Wind Farms Considering Cognitive Correction.” International Conference on Neural Networks, Information and Communication Engineering (NNICE), 2026, pp. 1469–1473. https://doi.org/10.1109/nnice68970.2026.11466238.
Chicago
Rong, Chengze, Zhenxiang Xiao, Liangwei Xue, and Zhenyu Wu. 2026. “Collaborative Opportunistic Maintenance Scheduling for Offshore Wind Farms Considering Cognitive Correction.” International Conference on Neural Networks, Information and Communication Engineering (NNICE): 1469–1473. https://doi.org/10.1109/nnice68970.2026.11466238.
Harvard
Rong, C. et al. (2026) ‘Collaborative Opportunistic Maintenance Scheduling for Offshore Wind Farms Considering Cognitive Correction’, International Conference on Neural Networks, Information and Communication Engineering (NNICE), pp. 1469–1473. doi:10.1109/nnice68970.2026.11466238.
IEEE
C. Rong, Z. Xiao, L. Xue, and Z. Wu, “Collaborative Opportunistic Maintenance Scheduling for Offshore Wind Farms Considering Cognitive Correction,” International Conference on Neural Networks, Information and Communication Engineering (NNICE), pp. 1469–1473, 2026, doi: 10.1109/nnice68970.2026.11466238.
BibTeX
@inproceedings{rong2026collaborative,
title = {{Collaborative Opportunistic Maintenance Scheduling for Offshore Wind Farms Considering Cognitive Correction}},
author = {Rong, Chengze and Xiao, Zhenxiang and Xue, Liangwei and Wu, Zhenyu},
booktitle = {International Conference on Neural Networks, Information and Communication Engineering (NNICE)},
year = {2026},
pages = {1469--1473},
doi = {10.1109/nnice68970.2026.11466238},
url = {https://doi.org/10.1109/nnice68970.2026.11466238}
}
Download for a reference manager: BibTeX (.bib) · RIS for Zotero, Mendeley and EndNote (.ris)
Topic and keywords
Physical Sciences › Engineering › Safety, Risk, Reliability and Quality › Reliability and Maintenance Optimization
- offshore wind farms
- maintenance scheduling
- opportunistic maintenance
- crew transfer vessels
- unmanned aerial vehicles
- cognitive correction
- rolling horizon optimization
- maintenance cost reduction
Work with this paper
Most-cited papers in Engineering
- A Closed‐form Equation for Predicting the Hydraulic Conductivity of Unsaturated SoilsMartinus Th. van Genuchten · Soil Science Society of America Journal · 1980 · 28,197 citations
- An improved technique for determining hardness and elastic modulus using load and displacement sensing indentation experimentsW. C. Oliver, George M. Pharr · Journal of materials research/Pratt's guide to venture capital sources · 1992 · 27,379 citations
- Digital communicationsOwen Bishop · Routledge eBooks · 2007 · 24,890 citations
- The empirical mode decomposition and the Hilbert spectrum for nonlinear and non-stationary time series analysisNorden Eh Huang, Zhengwei Shen, Steven R. Long and 6 more · Proceedings of the Royal Society A Mathematical Physical and Engineering Sciences · 1998 · 24,008 citations
- Numerical Heat Transfer and Fluid FlowSuhas V. Patankar · CRC Press eBooks · 2018 · 23,491 citations
Questions about this paper
How do I cite this paper in APA style?
Rong, C., Xiao, Z., Xue, L., & Wu, Z. (2026). Collaborative Opportunistic Maintenance Scheduling for Offshore Wind Farms Considering Cognitive Correction. International Conference on Neural Networks, Information and Communication Engineering (NNICE), 1469–1473. https://doi.org/10.1109/nnice68970.2026.11466238
How many times has this paper been cited?
0 times, according to OpenAlex on 19 November 2026. Google Scholar and Scopus count different sets of sources, so their numbers differ.
Is this paper free to read?
OpenAlex records no free legal copy. Check your library's access, the authors' pages or a repository, or ask the corresponding author for a copy.
Who wrote this paper?
Chengze Rong, Zhenxiang Xiao, Liangwei Xue, Zhenyu Wu.
What is the DOI of this paper?
10.1109/nnice68970.2026.11466238, permanently at https://doi.org/10.1109/nnice68970.2026.11466238. Sign in and open it from this page.
Bibliographic data from OpenAlex (CC0), last checked 19 November 2026. ResearchGuru does not host this paper; once you are signed in, the links open it at the publisher or the repository that does.