Journal article · 2022 · Open access

ANALYSIS OF FORGING MACHINE EFFECTIVENESS USING OVERALL EQUIPMENT EFFECTIVENESS (OEE) AND SIX BIG LOSSES METHODS (CASE STUDY : PT X)

Al Rizki Dermawan, Yani Iriani

Jurnal Darma Agung, 30(3), 195 · Published 9 November 2022 · DOI 10.46930/ojsuda.v30i3.2218

Free PDFView at the publisherCite this paper

In brief

“ANALYSIS OF FORGING MACHINE EFFECTIVENESS USING OVERALL EQUIPMENT EFFECTIVENESS (OEE) AND SIX BIG LOSSES METHODS (CASE STUDY : PT X)” is a 2022 journal article by Al Rizki Dermawan and Yani Iriani, published in Jurnal Darma Agung. OpenAlex counts 1 citations as of 15 November 2026, which puts it in the top 9% of works published in 2022 by citations. It is open access under a CC BY-NC-ND licence: the full text is free to read at Jurnal Darma Agung.

Citations
1
Most cited in
2026 (1)
Authors
2

Abstract

PT X is a company in the manufacturing industry, with automotive spare parts being its main product. The current issue at PT X is a production shortage. One of the causes of decreased productivity, according to observations, is that there is still waste in the form of waiting time produced by a variety of factors such as workers, machines, and materials. The forging machine factor is the problem that contributes the most to PT X. The problem is that waiting is often inefficient because the product is of poor quality. The purpose of this research was to determine the value of Overall Equipment Effectiveness (OEE) on fitting forging machines and to identify issues in the production line using Six Big Losses. The Overall Equipment Effectiveness (OEE) method is a comprehensive performance measurement related to the availability of quality and productivity processes, whereas the Six Big Losses are equipment failure, set up and adjustment losses, idling and minor stoppages, reduced speed losses, quality defects and rework, and reduced yield or scrap losses. According to the findings of this survey, the average OEE value is 83.84%. As a result, it falls under the category of not meeting the standards. While calculating the Six Big Losses, the most common type of waste is the lower yield or scrap loss of 4.25%. Improvement efforts are focused mostly on the quality line, with the 4M+1E (Man, Machine, Material, Method, and Environment) factor influencing the low OEE value. The machine factor is the most important contributor to the appearance of shape change or product reject deformation in the 4M+1E analysis. Thus, PT X must enhance the temperature parameter settings and the length of the pressing process to reduce shape rejects.

Cite this paper

Formatted from the catalogue record. Check names, capitals and page numbers against the paper before you submit.

APA 7

Dermawan, A. R., & Iriani, Y. (2022). ANALYSIS OF FORGING MACHINE EFFECTIVENESS USING OVERALL EQUIPMENT EFFECTIVENESS (OEE) AND SIX BIG LOSSES METHODS (CASE STUDY : PT X). Jurnal Darma Agung, 30(3), 195. https://doi.org/10.46930/ojsuda.v30i3.2218

MLA 9

Dermawan, Al Rizki, and Yani Iriani. “ANALYSIS OF FORGING MACHINE EFFECTIVENESS USING OVERALL EQUIPMENT EFFECTIVENESS (OEE) AND SIX BIG LOSSES METHODS (CASE STUDY : PT X).” Jurnal Darma Agung, vol. 30, no. 3, 2022, p. 195. https://doi.org/10.46930/ojsuda.v30i3.2218.

Chicago

Dermawan, Al Rizki and Yani Iriani. 2022. “ANALYSIS OF FORGING MACHINE EFFECTIVENESS USING OVERALL EQUIPMENT EFFECTIVENESS (OEE) AND SIX BIG LOSSES METHODS (CASE STUDY : PT X).” Jurnal Darma Agung 30 (3): 195. https://doi.org/10.46930/ojsuda.v30i3.2218.

Harvard

Dermawan, A. R. and Iriani, Y. (2022) ‘ANALYSIS OF FORGING MACHINE EFFECTIVENESS USING OVERALL EQUIPMENT EFFECTIVENESS (OEE) AND SIX BIG LOSSES METHODS (CASE STUDY : PT X)’, Jurnal Darma Agung, 30(3), p. 195. doi:10.46930/ojsuda.v30i3.2218.

IEEE

A. R. Dermawan and Y. Iriani, “ANALYSIS OF FORGING MACHINE EFFECTIVENESS USING OVERALL EQUIPMENT EFFECTIVENESS (OEE) AND SIX BIG LOSSES METHODS (CASE STUDY : PT X),” Jurnal Darma Agung, vol. 30, no. 3, p. 195, 2022, doi: 10.46930/ojsuda.v30i3.2218.

BibTeX

@article{dermawan2022analysis,
  title     = {{ANALYSIS OF FORGING MACHINE EFFECTIVENESS USING OVERALL EQUIPMENT EFFECTIVENESS (OEE) AND SIX BIG LOSSES METHODS (CASE STUDY : PT X)}},
  author    = {Dermawan, Al Rizki and Iriani, Yani},
  journal   = {Jurnal Darma Agung},
  year      = {2022},
  volume    = {30},
  number    = {3},
  pages     = {195},
  doi       = {10.46930/ojsuda.v30i3.2218},
  url       = {https://doi.org/10.46930/ojsuda.v30i3.2218}
}

Download for a reference manager: BibTeX (.bib) · RIS for Zotero, Mendeley and EndNote (.ris)

Topic and keywords

Social Sciences › Business, Management and Accounting › Strategy and Management › Management and Optimization Techniques

  • forging equipment
  • overall equipment effectiveness
  • six big losses
  • production waste
  • machine downtime
  • production efficiency
  • product quality defects

Work with this paper

Most-cited papers in Business, Management and Accounting

All highly cited Business, Management and Accounting papers

Questions about this paper

How do I cite this paper in APA style?

Dermawan, A. R., & Iriani, Y. (2022). ANALYSIS OF FORGING MACHINE EFFECTIVENESS USING OVERALL EQUIPMENT EFFECTIVENESS (OEE) AND SIX BIG LOSSES METHODS (CASE STUDY : PT X). Jurnal Darma Agung, 30(3), 195. https://doi.org/10.46930/ojsuda.v30i3.2218

How many times has this paper been cited?

1 times, according to OpenAlex on 15 November 2026. Google Scholar and Scopus count different sets of sources, so their numbers differ.

Is this paper free to read?

Yes. It is open access: read the free full text at Jurnal Darma Agung.

Who wrote this paper?

Al Rizki Dermawan, Yani Iriani.

What is the DOI of this paper?

10.46930/ojsuda.v30i3.2218. The permanent link is https://doi.org/10.46930/ojsuda.v30i3.2218.

Bibliographic data from OpenAlex (CC0), last checked 15 November 2026. ResearchGuru does not host this paper; the links go to the publisher or the repository that does.