Journal article · 2021 · Open access
ANALISIS DAN PERANCANGAN ULANG TATA LETAK FASILITAS PRODUKSI DENGAN METODE SYSTEMATIC LAYOUT PLANNING
Journal of Industrial View, 3(2), 55–63 · Published 7 December 2021 · DOI 10.26905/jiv.v3i2.6678
In brief
“ANALISIS DAN PERANCANGAN ULANG TATA LETAK FASILITAS PRODUKSI DENGAN METODE SYSTEMATIC LAYOUT PLANNING” is a 2021 journal article by Fu'ad Kautsar and 2 co-authors, published in Journal of Industrial View. OpenAlex counts 11 citations as of 19 November 2026. It is open access under a CC BY-NC-ND licence: the full text is free to read at Journal of Industrial View.
- Citations
- 11
- Most cited in
- 2024 (5)
- Field-weighted impact
- 0.54
- References
- 6
- Authors
- 3
Abstract
Home industry cetakan kue Fandy adalah perusahaan rumahan yang memproduksi cetakan kue menggunakan teknik cor dengan bahan baku alumunium. Permasalahan yang terjadi pada Tata letak pada Home industry cetakan kue Fandy adalah adanya waste (pemborosan) yang terjadi. Seperti waste gerakan bolak-balik seperti pada stasiun percetakan menuju stasiun pemotongan dan pengikiran yang harus melewati stasiun bahan baku terlebih dahulu Waste transportasi berlebihan seperti Proses perpindahan bahan baku menuju stasiun peleburan yang cukup jauh yang seharusnya berdekatan. Permasalahan tersebut dapat menyebabkan ongkos material handling menjadi lebih besar hal ini yang nantinya berpengaruh pada besarnya biayaproduksi dan waktu proses produksi. Perancangan ulang tata letak fasilitas pada stasiun kerja dan perbaikan layout usulan dengan menggunakan pendekatan metode Systematic Layout Planning (SLP). Ada beberapa tahapan dari SLP yaitu tahap analisis, tahap penyesuaian dan tahap evaluasi. Tahap analisis seperti analisis aliran material, activity relationship chart (ARC) dan activity relationship diagram (ARD). Tahap analisis seperti perencanaan hubungan diagram ruangan dan perancangan alternatif layout. Dan pada tahap evaluasi dilakukan perhitungan untuk mendapatkan ongkos material handling yang minimum.Berdasarkan hasil perancangan dengan metode Systematic Layout Planning (SLP) perhitungan jarak material handling layout awal jarak total yang ditempuh pada proses produksi adalah sebesar 1981,8 meter dalam priode satu minggu. Sedangkan jarak total yang di tempuh untuk proses produksi pada layout usulan adalah sebesar 1732,05 meter dalam satu minggu. Dengan ongkos material handling (OMH) perminggu layout awal sebesar Rp 777.238,00 setelahdilakukan perbaikan usulan menjadi Rp 691.006,82 dengan penghematan sebesar 11%.
Cite this paper
Formatted from the catalogue record. Check names, capitals and page numbers against the paper before you submit.
APA 7
Kautsar, F., Zaman, M. Z., & Wiati, N. M. (2021). ANALISIS DAN PERANCANGAN ULANG TATA LETAK FASILITAS PRODUKSI DENGAN METODE SYSTEMATIC LAYOUT PLANNING. Journal of Industrial View, 3(2), 55–63. https://doi.org/10.26905/jiv.v3i2.6678
MLA 9
Kautsar, Fu'ad, et al. “ANALISIS DAN PERANCANGAN ULANG TATA LETAK FASILITAS PRODUKSI DENGAN METODE SYSTEMATIC LAYOUT PLANNING.” Journal of Industrial View, vol. 3, no. 2, 2021, pp. 55–63. https://doi.org/10.26905/jiv.v3i2.6678.
Chicago
Kautsar, Fu'ad, Mohammad Zuheruz Zaman, and Ni Made Wiati. 2021. “ANALISIS DAN PERANCANGAN ULANG TATA LETAK FASILITAS PRODUKSI DENGAN METODE SYSTEMATIC LAYOUT PLANNING.” Journal of Industrial View 3 (2): 55–63. https://doi.org/10.26905/jiv.v3i2.6678.
Harvard
Kautsar, F., Zaman, M. Z. and Wiati, N. M. (2021) ‘ANALISIS DAN PERANCANGAN ULANG TATA LETAK FASILITAS PRODUKSI DENGAN METODE SYSTEMATIC LAYOUT PLANNING’, Journal of Industrial View, 3(2), pp. 55–63. doi:10.26905/jiv.v3i2.6678.
IEEE
F. Kautsar, M. Z. Zaman, and N. M. Wiati, “ANALISIS DAN PERANCANGAN ULANG TATA LETAK FASILITAS PRODUKSI DENGAN METODE SYSTEMATIC LAYOUT PLANNING,” Journal of Industrial View, vol. 3, no. 2, pp. 55–63, 2021, doi: 10.26905/jiv.v3i2.6678.
BibTeX
@article{kautsar2021analisis,
title = {{ANALISIS DAN PERANCANGAN ULANG TATA LETAK FASILITAS PRODUKSI DENGAN METODE SYSTEMATIC LAYOUT PLANNING}},
author = {Kautsar, Fu'ad and Zaman, Mohammad Zuheruz and Wiati, Ni Made},
journal = {Journal of Industrial View},
year = {2021},
volume = {3},
number = {2},
pages = {55--63},
doi = {10.26905/jiv.v3i2.6678},
url = {https://doi.org/10.26905/jiv.v3i2.6678}
}
Download for a reference manager: BibTeX (.bib) · RIS for Zotero, Mendeley and EndNote (.ris)
Citations by year
| Year | Citations | Share of the best year |
|---|---|---|
| 2024 | 5 | |
| 2025 | 3 | |
| 2026 | 3 |
Its field-weighted citation impact is 0.54: it has been cited 0.54 times as often as the average work of the same field, type and year (1.00 is the world average).
Topic and keywords
Physical Sciences › Engineering › Industrial and Manufacturing Engineering › Advanced Manufacturing and Logistics Optimization
- systematic layout planning
- production facility layout
- material handling cost
- material flow analysis
- activity relationship chart
- activity relationship diagram
- aluminum casting
- waste reduction
Work with this paper
Most-cited papers in Engineering
- A Closed‐form Equation for Predicting the Hydraulic Conductivity of Unsaturated SoilsMartinus Th. van Genuchten · Soil Science Society of America Journal · 1980 · 28,197 citations
- An improved technique for determining hardness and elastic modulus using load and displacement sensing indentation experimentsW. C. Oliver, George M. Pharr · Journal of materials research/Pratt's guide to venture capital sources · 1992 · 27,379 citations
- Digital communicationsOwen Bishop · Routledge eBooks · 2007 · 24,890 citations
- The empirical mode decomposition and the Hilbert spectrum for nonlinear and non-stationary time series analysisNorden Eh Huang, Zhengwei Shen, Steven R. Long and 6 more · Proceedings of the Royal Society A Mathematical Physical and Engineering Sciences · 1998 · 24,008 citations
- Numerical Heat Transfer and Fluid FlowSuhas V. Patankar · CRC Press eBooks · 2018 · 23,491 citations
Questions about this paper
How do I cite this paper in APA style?
Kautsar, F., Zaman, M. Z., & Wiati, N. M. (2021). ANALISIS DAN PERANCANGAN ULANG TATA LETAK FASILITAS PRODUKSI DENGAN METODE SYSTEMATIC LAYOUT PLANNING. Journal of Industrial View, 3(2), 55–63. https://doi.org/10.26905/jiv.v3i2.6678
How many times has this paper been cited?
11 times, according to OpenAlex on 19 November 2026. Google Scholar and Scopus count different sets of sources, so their numbers differ.
Is this paper free to read?
Yes. It is open access at Journal of Industrial View: sign in and open the PDF from this page.
Who wrote this paper?
Fu'ad Kautsar, Mohammad Zuheruz Zaman, Ni Made Wiati.
What is the DOI of this paper?
10.26905/jiv.v3i2.6678, permanently at https://doi.org/10.26905/jiv.v3i2.6678. Sign in and open it from this page.
Bibliographic data from OpenAlex (CC0), last checked 19 November 2026. ResearchGuru does not host this paper; once you are signed in, the links open it at the publisher or the repository that does.